Site Final | 5/1/2015 | 5/1/2015 | 5/1/2015 | P | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 5/1/2015 | 5/1/2015 | 5/1/2015 | P | PASS |
Phil Shearer
|
|
|
|
Aging Inspection | 4/17/2015 | 4/17/2015 | 4/17/2015 | | PASS |
Andy J. Long
|
|
|
Home complete, requires landscaping. East Vally Tahoe homes to be landscaped at once. Will final after stabilization and cleanup.
|
Site Preparation | 11/12/2014 | 11/13/2014 | 11/13/2014 | A | PASS |
Andy J. Long
|
|
|
Clint Phone #: ###-####
East Valley Tahoe home site are ready for excavation. BMPs include lined washout, drop inlet protection, and designated parking on streets to prevent trackout. Approved
|