Site Final | 5/11/2015 | 5/11/2015 | 5/11/2015 | P | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 5/11/2015 | 5/11/2015 | 5/11/2015 | P | PASS |
Phil Shearer
|
|
|
|
Tracking Control | 1/8/2015 | 1/8/2015 | 1/8/2015 | P | PASS |
Andy J. Long
|
|
|
Follow up on CN from 1/7
Stockpiles have been backfilled around foundation and the sidewalk, street, and gutter have been cleaned as requested.
Corrections complete. Approved.
|
Random Inspection | 1/7/2015 | 1/7/2015 | 1/7/2015 | P | FAIL |
Andy J. Long
|
|
|
Stockpiles of dirt from the excavation and installation of foundation has been stockpiled in the sidewalk, gutter, and into the street.
Need to clean up dirt and educate foundation crew about proper stockpile storage.
Verbal request issued to Tahoe Homes RP.
|
Site Preparation | 12/18/2014 | 12/18/2014 | 12/18/2014 | P | PASS |
Andy J. Long
|
|
|
Clint Phone #: ###-####
Permit posted, East Valley storm drains protected and lined washout is provided. Approved.
|