Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberESC14-01030
StatusFinaled
Name JIM CARRIVEAU
Site Address 592 W MCGREGOR DR
Project NameHawkinson Warehouse
Customer Number 
ePlanReviewNo
Description
Hawkinson Warehouse - 11,215 SF Warehouse for Recreational Use. NY Canal Very Close to project
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection10/16/201510/16/201510/16/2015 PASS
DetailsEvan Jenkins
DOC - Permit Finaled10/16/201510/16/201510/16/2015PPASS
DetailsEvan Jenkins
Project Complete
ESC Conditons Satisfied
General Inspection10/1/201510/1/201510/1/2015 PASS
DetailsAndy J. Long
General Inspection9/16/20159/16/20159/17/2015 PASS
DetailsAndy J. Long
General Inspection9/1/20159/1/20159/1/2015 PEND
DetailsAndy J. Long
Need to remove temp BMPs..
General Inspection8/17/20158/17/20158/17/2015 PASS
DetailsAndy J. Long
All work complete. Silt fence is installed. Will let area next to new curb become more vegitated before requesting to remove the silt fence.
General Inspection7/31/20157/31/20157/31/2015 PASS
DetailsAndy J. Long
Warehouse is complete on exterior and parking lot and grounds are stabilized. No discharges or pollution sources observed.

To final permit will need to remove silt fence and check frontage area between parcel and McGregor for stabilization/tacifier. Will check progress next inspection.
General Inspection7/16/20157/16/20157/16/2015 PASS
DetailsAndy J. Long
General Inspection7/1/20157/1/20157/1/2015 PASS
DetailsAndy J. Long
Warehouse structure is complete. Site improvements, parking lot, and landscaping are now occuring. No trackout or discharges offsite. No fugitive dust observed. Approved.
General Inspection6/16/20156/16/20156/17/2015 CANC
DetailsJim Storey
General Inspection6/1/20156/1/20156/1/2015 CANC
DetailsEvan Jenkins
General Inspection5/15/20155/15/20155/15/2015 PASS
DetailsAndy J. Long
No activity at time of inspection. Warehouse walls have been erected. BMPs include construction entrance, permit signage, and silt fence along south boundary above canal. No corrections needed. Clean site.
General Inspection4/30/20154/30/20154/30/2015 PASS
DetailsAndy J. Long
General Inspection4/7/20154/7/20154/7/2015PPASS
DetailsAndy J. Long
Warehouse frame is being built. Silt fence installed along north of protect to protect hillside vegetation. No trackout, permits posted. Approved.
General Inspection3/20/20153/20/20153/20/2015APASS
DetailsAndy J. Long
WIP on warehouse. Permit posted, BMPs installed included hillside silt fence, construciton entrance, concrete washout container, and DI protection on McGregor.

Trash is contained and materials consolidated. Very clean site, no trackout or discharges.
Random Inspection2/2/20152/2/20152/2/2015PPASS
DetailsAndy J. Long
Permit posted with SWPPP and eNOI info. No activity at site at time of inspection. No trackout, discharges or hillside erosion on back bank observed. No corrections required.
Random Inspection1/8/20151/8/20151/8/2015PPASS
DetailsAndy J. Long
Permit posted. No trackout from site. BMPs installed.
Tracking Control12/16/201412/16/201412/16/2014PPASS
DetailsAndy J. Long
Permit posted. Trackout noted earlier has been cleaned. WIP. No corrections at this time.
Random Inspection12/3/201412/3/201412/3/2014PPART
DetailsAndy J. Long
Work start without notification or onsite site preparation inspection.

Permit posted with eNOI information. Stabilized construction entrance installed and no trackout occuring, but rock is not per plan detail (too small). Will need to monitor. Silt fence installed at north boundary between site and NY Canal. No activity at site at time of construction and during the rain. No corrections at this time.