General Inspection | 10/16/2015 | 10/16/2015 | 10/16/2015 | | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 10/16/2015 | 10/16/2015 | 10/16/2015 | P | PASS |
Evan Jenkins
|
|
|
Project Complete ESC Conditons Satisfied
|
General Inspection | 10/1/2015 | 10/1/2015 | 10/1/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/16/2015 | 9/16/2015 | 9/17/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/1/2015 | 9/1/2015 | 9/1/2015 | | PEND |
Andy J. Long
|
|
|
Need to remove temp BMPs..
|
General Inspection | 8/17/2015 | 8/17/2015 | 8/17/2015 | | PASS |
Andy J. Long
|
|
|
All work complete. Silt fence is installed. Will let area next to new curb become more vegitated before requesting to remove the silt fence.
|
General Inspection | 7/31/2015 | 7/31/2015 | 7/31/2015 | | PASS |
Andy J. Long
|
|
|
Warehouse is complete on exterior and parking lot and grounds are stabilized. No discharges or pollution sources observed.
To final permit will need to remove silt fence and check frontage area between parcel and McGregor for stabilization/tacifier. Will check progress next inspection.
|
General Inspection | 7/16/2015 | 7/16/2015 | 7/16/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/1/2015 | 7/1/2015 | 7/1/2015 | | PASS |
Andy J. Long
|
|
|
Warehouse structure is complete. Site improvements, parking lot, and landscaping are now occuring. No trackout or discharges offsite. No fugitive dust observed. Approved.
|
General Inspection | 6/16/2015 | 6/16/2015 | 6/17/2015 | | CANC |
Jim Storey
|
|
|
|
General Inspection | 6/1/2015 | 6/1/2015 | 6/1/2015 | | CANC |
Evan Jenkins
|
|
|
|
General Inspection | 5/15/2015 | 5/15/2015 | 5/15/2015 | | PASS |
Andy J. Long
|
|
|
No activity at time of inspection. Warehouse walls have been erected. BMPs include construction entrance, permit signage, and silt fence along south boundary above canal. No corrections needed. Clean site.
|
General Inspection | 4/30/2015 | 4/30/2015 | 4/30/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/7/2015 | 4/7/2015 | 4/7/2015 | P | PASS |
Andy J. Long
|
|
|
Warehouse frame is being built. Silt fence installed along north of protect to protect hillside vegetation. No trackout, permits posted. Approved.
|
General Inspection | 3/20/2015 | 3/20/2015 | 3/20/2015 | A | PASS |
Andy J. Long
|
|
|
WIP on warehouse. Permit posted, BMPs installed included hillside silt fence, construciton entrance, concrete washout container, and DI protection on McGregor.
Trash is contained and materials consolidated. Very clean site, no trackout or discharges.
|
Random Inspection | 2/2/2015 | 2/2/2015 | 2/2/2015 | P | PASS |
Andy J. Long
|
|
|
Permit posted with SWPPP and eNOI info. No activity at site at time of inspection. No trackout, discharges or hillside erosion on back bank observed. No corrections required.
|
Random Inspection | 1/8/2015 | 1/8/2015 | 1/8/2015 | P | PASS |
Andy J. Long
|
|
|
Permit posted. No trackout from site. BMPs installed.
|
Tracking Control | 12/16/2014 | 12/16/2014 | 12/16/2014 | P | PASS |
Andy J. Long
|
|
|
Permit posted. Trackout noted earlier has been cleaned. WIP. No corrections at this time.
|
Random Inspection | 12/3/2014 | 12/3/2014 | 12/3/2014 | P | PART |
Andy J. Long
|
|
|
Work start without notification or onsite site preparation inspection.
Permit posted with eNOI information. Stabilized construction entrance installed and no trackout occuring, but rock is not per plan detail (too small). Will need to monitor. Silt fence installed at north boundary between site and NY Canal. No activity at site at time of construction and during the rain. No corrections at this time.
|