Permit Information
Permit NumberESC14-01052
StatusFinaled
Name PAT PALMER
Site Address 826 N MAPLE GROVE RD
Project NameAshville Commons Apartments
Customer Number 
ePlanReviewNo
Description
3.75 Acre Env. Sensative Apartment Complex with Site Improvements
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection4/11/20164/11/20164/11/2016 PASS
DetailsAndy J. Long
Asheville Commons is complete. SWPPP info and permit removed from. All temp BMPs are removed and landscaping has stabilized open areas. Area between complex path and irrigation ditch has been cleaned and hydromulched to stabilized the upper portion of the bank.

ESC permit conditions satisfied.
DOC - Permit Finaled4/11/20164/11/20164/11/2016PPASS
DetailsAndy J. Long
General Inspection3/25/20163/25/20163/25/2016 CANC
DetailsAndy J. Long
General Inspection3/10/20163/10/20163/10/2016 PASS
DetailsAndy J. Long
WIP on painting, landscaping, finishing interior touches, and carports at Asheville. Single 4-plex permits finaled. No corrections at this time. Many units already occupied.
General Inspection2/24/20162/24/20162/24/2016 PASS
DetailsEvan Jenkins
General Inspection2/9/20162/9/20162/9/2016 PEND
DetailsEvan Jenkins
Perm Re-veg
General Inspection1/25/20161/25/20161/25/2016PPASS
DetailsAndy J. Long
No trackout or prohibited discharges observed at Asheville Commons.

Correction to clean up trash and materials along South Slough has been completed. There is still some trash remaining and WIP on 4-plexes, so should be checked each weekend.

Parking lot swept, still some mud accumulations on the permeable pavement. RP Jeremy stated they will have to do maintenance during final phases of project to make operational.

No outstanding corrections at this time.
General Inspection1/15/20161/15/20161/15/2016 PART
DetailsAndy J. Long
No trackout or discharges to Maple Grove or to the MS4. Several units at the front of Ashville Commons are complete and sod has been laid. Several apartments are occupied.

SWPPP sign and box are still posted, though there are no recent site inspections, possibly due to vertical construction only?

Lots of trash, boxes, building materials along South Slough. Even some ventilation tubing in ditch itself. Shows lack of housekeeping and inadequate waste management.

At the east end of parking/access area there is a lot of mud and other debris. The permeable pavement has mud and sediment all over it which will prevent proper drainaige.

Corrections to pick up trash and protect/clean newly installed stormwater infrastructure to Biltmore RP.
General Inspection12/31/201512/31/201512/31/2015 PASS
DetailsEvan Jenkins
General Inspection12/16/201512/16/201512/16/2015 PASS
DetailsEvan Jenkins
No Activity at this time
General Inspection12/1/201512/1/201512/1/2015 CANC
DetailsAndy J. Long
General Inspection11/16/201511/16/201511/16/2015 PART
DetailsAndy J. Long
RP Pat Palmer onsite. All 4-plex units are underway and have individual trash containers. Lined concrete washout box has been utilized.

Over weekend the parking lot and access drive were swept and clean in response to Correction Request by Mike Jordan. Sweeping was thorough and no trackout or sediment runoff is occuring at site.

Correction:
- Need to pick up litter and consruction material wrappings that are trapped along north canal/ditch bank and make sure light weight trash is either covered or weighed down to prevent being blown by wind.
General Inspection10/30/201510/30/201510/30/2015 PASS
DetailsAndy J. Long
No trackout or discharges from Asheville Commons. WIP on 4-plexes, perimeter BMPs installed, stormwater contained on site.
General Inspection10/14/201510/14/201510/14/2015 PASS
DetailsEvan Jenkins
WIP: on 4-plexes. no esc issues observed
General Inspection9/29/20159/29/20159/29/2015 PASS
DetailsEvan Jenkins
WIP: on mulitiple buildings. Permits posted on each. No ESC issues at this time of inspection
General Inspection9/14/20159/14/20159/14/2015 CANC
DetailsAndy J. Long
General Inspection8/28/20158/28/20158/28/2015 PASS
DetailsEvan Jenkins
Sidewalks and roads are now paved/completed
No Trackout or discharges leaving the site.
No ESC issues at this time
General Inspection8/13/20158/13/20158/13/2015 PART
DetailsAndy J. Long
WIP on Asheville Commons. Putting asphalt down now for access road which will cut down trackout and dust. Minimal trackout to Maple Grove, no fugitive dust observed.
General Inspection7/29/20157/29/20157/29/2015 PART
DetailsAndy J. Long
No trackout from Asheville commons, no dewatering or other discharges occuring.

Correction request:

- movement & hauling from bobcat tractor is kicking up dust which at times is blowing to the north and affecting apartment complex. Requested that water suppression and slower operation speeds be implemented today. RP stated he will make correction. Will continue to monitor.
Tracking Control7/14/20157/14/20157/14/2015AFAIL
DetailsAndy J. Long
Trackout to Maple Grove from site due to road prep work occuring. No construction entrance becuase entrance is where sandy/gravel road base is.

Correction issue Biltmore Co. RP to have sweeper truck come this afternoon.

No dust or other issues. Silt fence perimeter installed.
General Inspection7/2/20157/7/20157/7/2015APART
DetailsAndy J. Long
Minimal activity at site by survey crew. No fugitive dust, silt fence perimeter control is installed and in good condition. No trash issues, no material or fuel storage at site.

Corrections:
- sweep up small amount of trackout in bike lane of Maple Grove.
- keep up to date on SWPPP & CGP inspections. Last dated inspection report is from 5/25.
General Inspection7/2/20157/2/20157/2/2015 CANC
DetailsAndy J. Long
rescheduled for early next week
General Inspection6/17/20156/17/20156/17/2015 PART
DetailsEvan Jenkins
No Activity at time of inspection.
Correction:
Sweep up curb on southern most Construction Entrance/Exit. Large Rocks, Dirt and Gravel in ACHD's ROW. Use only one Entrance/Exit to reduce chances of trackout/discharges from site.
Attempted to call RP Jeremy Amar but Biltmore Co's office stated he's out of the office this week. Will follow up at the end of the week
General Inspection5/28/20155/28/20155/28/2015 CANC
DetailsEvan Jenkins
General Inspection5/6/20155/7/20155/7/2015APASS
DetailsAndy J. Long
site walk through at 9 AM with Jeremy Amar with Biltmore (developer)

Silt fence is installed along the north boundary of the site and should treat sheet flow from the site, which is 3+ acres with a slight slope in that direction. Excavator (Nampa Paving) will be hauing in dirt to raise elevatio up to 3 ft in some areas. Construction entrance rock on site and is in process of being installed. Irrigation district has prohibited silt fence along southern border, a construction fence will be installed to show limits of disturbance and keep machinery away from embankment.

Site has permission to pump water into water truck for compaction and dust control.

1 correction:
Install DI bag on MS4 approx. 50 yds N on Maple Grove.
General Inspection5/6/20155/6/20155/6/2015 PASS
DetailsAndy J. Long
Grubbing and grading has started at Ashville Commons. Previous discussions with Biltmore RP Jeremy cleared start of project due to initial BMPs (silt fence perimeter, construction entrance) already being installed. No trackout at site.

Site walk through scheduled for tomorrow AM @ 9

Individual 4-plexes covered seperately, see ESC15-00070 to -00083 (13 units, 1 clubhouse/office)