Site Final | 6/18/2015 | 6/18/2015 | 6/18/2015 | P | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 6/18/2015 | 6/18/2015 | 6/18/2015 | P | PASS |
Phil Shearer
|
|
|
|
Aging Inspection | 5/15/2015 | 5/15/2015 | 5/15/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Permit sign posted. Contractors working on interior. Needs landscaping/stabilization.
Trash container is being used, materials stored on parcel with no runoff leaving area. Approved.
|
Site Preparation | 1/26/2015 | 1/26/2015 | 1/26/2015 | P | PART |
Andy J. Long
|
|
|
Clint Phone #: ###-####
Parcel for new home is ready, but CN issued to Tahoe homes to tell material delivery companies to stop driving on mud and causing trackout as well as unstaking BMPs (fiber compost wattles) without repairing them.
|