General Inspection | 7/22/2015 | 7/22/2015 | 7/22/2015 | | PASS |
Andy J. Long
|
|
|
Previous home demolished. New home now in progress and covered under ESC15-00709
|
DOC - Permit Finaled | 7/22/2015 | 7/22/2015 | 7/22/2015 | P | PASS |
Andy J. Long
|
|
|
|
Site Final | 7/2/2015 | 7/7/2015 | 7/7/2015 | A | NR |
Andy J. Long
|
|
|
Permit to remain open since new project will occcur by homeowner. No dirt leaving site but the bank will need stabilization. No corrections at this time, will check in with homeowner next inspection.
|
General Inspection | 7/2/2015 | 7/2/2015 | 7/2/2015 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final next tuesday
|
General Inspection | 6/17/2015 | 6/17/2015 | 6/17/2015 | | PEND |
Evan Jenkins
|
|
|
|
General Inspection | 5/29/2015 | 5/29/2015 | 5/29/2015 | | PEND |
Evan Jenkins
|
|
|
No Activity at time of inspection No Sediment leaving site Guator Guard Along bottom of site
|
Aging Inspection | 5/14/2015 | 5/14/2015 | 5/15/2015 | | PASS |
Andy J. Long
|
|
|
No activity. No evidence of recent sediment runoff after corrections and wattle were installed. Old BLD permit was voided and a new one is under review
|
BMP Violation | 3/3/2015 | 3/3/2015 | 3/3/2015 | A | PEND |
Andy J. Long
|
|
|
RP voicemail states out of town till late March. No workers or people at site. Returned to leave written correction notice:
1. Extend length of gatorguard wattle and trench in and secure with stakes 2. Sweep loose sediment off Sherman, driveway and curbs 3. Divert flow of stormwater from rill that has been created. 4. Move stockpile off of slope to flat area or provide perimter sediment control
|
Complaint Inspection | 2/27/2015 | 2/27/2015 | 2/27/2015 | P | FAIL |
Andy J. Long
|
|
|
Corrections:
1. Need to trench in wattle and stake in. 2. Sweep loose dirt off driveway and curb 3. Stockpile needs perimeter protection. (will recommend install another wattle up above the one that is currently installed.
Notified homeowner RP Matt.
|
Complaint Inspection | 2/26/2015 | 2/27/2015 | 2/27/2015 | A | PEND |
Andy J. Long
|
|
|
Complaint per ACHD: Sediment leaving construction site, entering ROW
|
BMP Violation | 1/22/2015 | 1/23/2015 | 1/23/2015 | A | PASS |
Andy J. Long
|
|
|
Street and gutter in front of street has been swept to remove the loose sediment. Gatorguard wattle has been installed as requested.
Still need to continue sweeping as sediment dries and easier swept.
|
BMP Violation | 1/22/2015 | 1/22/2015 | 1/22/2015 | P | CANC |
Andy J. Long
|
|
|
Follow up on CN issued 1/21;
data entry. Follow up scheduled for 1/23
|
Complaint Inspection | 1/21/2015 | 1/21/2015 | 1/21/2015 | P | FAIL |
Andy J. Long
|
|
|
Complaint of large quantities of sediment covering the streets, no BMP's and turbid discharge. Hillside home project.
Permit is posted but no sediment containment BMPs installed at the toe of slope and edge of pavement.
Correction request given to homeowner RP over telephone:
1. Sweep up road and trackout that has occured. 2. Install sediment containment BMPs at toe of slope. (ie. gatorguard wattle) 3. Rake out rill erosion that has occured,
Compliance date is Friday, I told RP to call me if questions about proper install.
|
Site Preparation | 11/25/2014 | 11/26/2014 | 11/26/2014 | A | PASS |
Evan Jenkins
|
|
|
Matt Phone #: ###-#### Permit Posted No ESC Issues at this time
|