Aging Inspection | 5/27/2015 | 5/27/2015 | 5/27/2015 | | PASS |
Andy J. Long
|
|
|
Patio home in Trailwind sub complete, landscaped and stabilized. DI bags to remain for ongoing development. Old washout pit was removed as requested and new hole is ready for lining. Streets, sidewalks, and gutters are free of loose dirt. Permit finaled.
|
DOC - Permit Finaled | 5/27/2015 | 5/27/2015 | 5/27/2015 | P | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 12/10/2014 | 12/11/2014 | 12/11/2014 | A | PASS |
Andy J. Long
|
|
|
Cameron Phone #: ###-####
4 lots adjacent to each other on Wright ST. in the Trailwinds sub. Perimeter wattles have been installed (trenched and staked) around the 4 sites. Permit posted with contact details (one ESC sign for the 4 sites OK per conversation with Ken - ESC foreman).
Approved for construction. Subdivision drop inlets have protection.
|