General Inspection | 5/20/2016 | 5/20/2016 | 5/20/2016 | | PASS |
Andy J. Long
|
|
|
No further ESC inspections needed. Structure complete and drainage review now approved. No disturbed area, no temp BMP removal needed. ESC permit finaled.
|
DOC - Permit Finaled | 5/20/2016 | 5/20/2016 | 5/20/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/4/2016 | 4/4/2016 | 4/4/2016 | | PASS |
Andy J. Long
|
|
|
WIP. Structure is built, WIP on interior and pavers being installed. No ESC violations
|
General Inspection | 2/16/2016 | 2/16/2016 | 2/16/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/1/2016 | 1/1/2016 | 1/4/2016 | | PASS |
Andy J. Long
|
|
|
WIP on interior. No ESC issues.
|
General Inspection | 11/16/2015 | 11/16/2015 | 11/16/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Framing on warehouse structure has resumed. No trackout or discharges from site. Stabilized construction entrance and worker parking area is in good condition.
Approved.
|
General Inspection | 9/30/2015 | 9/30/2015 | 9/30/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/14/2015 | 8/14/2015 | 8/14/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 | | PASS |
Andy J. Long
|
|
|
WIP. No trackout from site. Minimal activity occuring, build frame & shell are up. No corrections.
|
General Inspection | 5/14/2015 | 5/14/2015 | 5/14/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Construction entrance provided. No trackout. No sediment leaving site via runoff. Approved.
|