General Inspection | 8/20/2015 | 8/20/2015 | 8/20/2015 | | PASS |
Andy J. Long
|
|
|
Vault and foundation work at MSTI are complte. Above ground building in progress and covered by ESC15-01106. This permit finaled.
No violations at site. No discharges or sediment leaving site. Staging and work area is well kept.
|
DOC - Permit Finaled | 8/20/2015 | 8/20/2015 | 8/20/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/5/2015 | 8/5/2015 | 8/5/2015 | | PASS |
Andy J. Long
|
|
|
NO trackout, all materials contained within designated and secure staging area. WIP.
|
General Inspection | 7/21/2015 | 7/21/2015 | 7/21/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/6/2015 | 7/6/2015 | 7/6/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/19/2015 | 6/19/2015 | 6/19/2015 | | PASS |
Andy J. Long
|
|
|
St,. Lukes project is in progress. No trackout from entrance onto Idaho. Materials stored and contained properly. Approved.
|
General Inspection | 6/4/2015 | 6/4/2015 | 6/4/2015 | | PASS |
Evan Jenkins
|
|
|
No Issues at this time
|
General Inspection | 5/20/2015 | 5/20/2015 | 5/20/2015 | | PASS |
Evan Jenkins
|
|
|
|
Random Inspection | 5/1/2015 | 5/1/2015 | 5/1/2015 | P | PASS |
Andy J. Long
|
|
|
WIP on basement & vault expansion at St. Luke's MSTI. No No trackout or discharges. Initial site prep, grading, and excavation under ESC14-00859 is now finaled. Project covered under this permit and ESC14-01106 (first floor TI-expansion)
|