Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberESC14-01106
StatusFinaled
Name PHIL DOBLE
Site Address 100 E IDAHO ST
Project NameMSTI True Beam - Building
Customer Number 
ePlanReviewNo
Description
This project consists of a vault for the truebeam accelerator located on the ground floor level of the msti building located at 100 east idaho street, boise, idaho. The entire building is fire sprinkled including the area of this tenant improvement
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection11/23/201511/23/201511/23/2015 PASS
DetailsAndy J. Long
Construction complete on exterior and staging area has been dismantled & cleaned. Disturbed area has been stabilized with sod. ESC permit finaled. BLD open for interior fire/life safety inspections.
DOC - Permit Finaled11/23/201511/23/201511/23/2015PPASS
DetailsAndy J. Long
General Inspection11/6/201511/6/201511/6/2015 PEND
DetailsEvan Jenkins
wip
General Inspection10/22/201510/22/201510/22/2015 PASS
DetailsAndy J. Long
Work near completion. Staging area fencing has been disassmbled. No trackout or discahrges from site. Disturbed area will be seeded, currently contained with perimeter wattle. Approved.
General Inspection10/7/201510/7/201510/7/2015 PASS
DetailsAndy J. Long
WIP, staging area still in use. No trackout or discharges. Work is occuring indoors mostly
General Inspection9/22/20159/22/20159/22/2015 PASS
DetailsAndy J. Long
General Inspection9/7/20159/7/20159/8/2015 PASS
DetailsAndy J. Long
General Inspection8/21/20158/21/20158/21/2015 PASS
DetailsAndy J. Long
WIP. No trackout or loose sediment around work area. Approved.
General Inspection8/6/20158/6/20158/6/2015 PASS
DetailsAndy J. Long
General Inspection7/22/20157/22/20157/22/2015 CANC
DetailsAndy J. Long
General Inspection7/7/20157/7/20157/7/2015 PASS
DetailsAndy J. Long
General Inspection6/22/20156/22/20156/22/2015 PASS
DetailsAndy J. Long
WIP on vault expansion and building (see also ESC14-01105). No sediment leaving site through trackout or runoff. Work area contained with wattles and construction fencing. No corrections.
General Inspection6/1/20156/1/20156/1/2015 PASS
DetailsEvan Jenkins
General Inspection5/15/20155/15/20155/15/2015 PASS
DetailsEvan Jenkins
No issues at this time