Site Final | 4/28/2015 | 4/28/2015 | 4/28/2015 | P | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 4/28/2015 | 4/28/2015 | 4/28/2015 | P | PASS |
Phil Shearer
|
|
|
|
BMP Violation | 4/10/2015 | 4/10/2015 | 4/10/2015 | P | PART |
Andy J. Long
|
|
|
No trackout or sediment leaving site. Washout performed on adajacent lot (owned by Lasher Construction).
RP on site. Verbal correction issued to clean up washout and have lined washout facility for next home. He agreed and will clean up today.
|
Site Preparation | 12/19/2014 | 12/19/2014 | 12/19/2014 | P | PART |
Andy J. Long
|
|
|
No site prep inspection or notification provided. Site was set up properly however.
Permit posted. Constractors staying off mud. DI protection is installed. Approved to continue, no other violations.
|