Site Final | 5/29/2015 | 5/29/2015 | 5/29/2015 | A | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 5/29/2015 | 5/29/2015 | 5/29/2015 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 3/19/2015 | 3/19/2015 | 3/19/2015 | P | PASS |
Andy J. Long
|
|
|
WIP on Pine Tree Village detached two story home. All phases complete except homes on Pine Nut and Grey Pine.
Some sediment accumulation on Pine Nut, site supervisor stated that sweeping will occur tomorrow after the the 4 homes are backfilled. No runoff or trackout and receiving DI has inlet protection with remaining capacity.
Silt fence installed behind homes to keep dirt in construction area. Trash is mostly contained.
Site is in good condition and has improved regular house keeping significantly. Approved.
|
Site Preparation | 1/2/2015 | 1/5/2015 | 1/5/2015 | P | PASS |
Andy J. Long
|
|
|
Jim Phone #: ###-####
8 remaining individual homes on the interior of Pinetree Village will begin later this week as conditions allow. This area has been cleaned of previous uncontained debris and materials, with 2-3 truck loads remaining (in progress). Receiving drop inlet bag has been emptied and reinstalled. Permits are posted. Approved. This is the last phase of Pinetree Village subdivision project. Stabilized staging and washout pit will be designated once it is know which parcels will begin first.
|