General Inspection | 6/2/2015 | 6/2/2015 | 6/2/2015 | | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 6/2/2015 | 6/2/2015 | 6/2/2015 | P | PASS |
Evan Jenkins
|
|
|
Project Complete ESC Conditions Satisfied
|
Random Inspection | 4/21/2015 | 4/21/2015 | 4/21/2015 | A | PASS |
Andy J. Long
|
|
|
WIP at Hyde Park Stinker. No trackout or discharges from site. Concrete washout container onsite for paving/curbing work. No corrections necessary
|
Site Preparation | 3/6/2015 | 3/6/2015 | 3/6/2015 | P | PASS |
Andy J. Long
|
|
|
Stinker Station addition/remodel is in progress. BMPs installed, no trackout or discharges. Project manager & store contact notified me about the start of construction.
Approved.
|