Site Final | 6/1/2015 | 6/1/2015 | 6/1/2015 | P | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 6/1/2015 | 6/1/2015 | 6/1/2015 | P | PASS |
Phil Shearer
|
|
|
|
Site Preparation | 1/19/2015 | 1/20/2015 | 1/20/2015 | A | PASS |
Andy J. Long
|
|
|
Phone #: ###-#### Inspection requested via web by Braxton Hansen
Permit posted. River Heights sub #5 BMPs are installed (DI bags/lined washout). Will need daily clean up during excavation and foundation work to control trackout due to muddy conditions in area.
|