Site Final | 7/21/2015 | 7/21/2015 | 7/21/2015 | A | PASS |
Andy J. Long
|
|
|
Dropzone sub SFH home complete, site cleaned, landscaped, and stabilized. Permit finaled.
|
Aging Inspection | 6/17/2015 | 6/17/2015 | 6/17/2015 | | PEND |
Evan Jenkins
|
|
|
Home Complete and Occupied Front yard has been sodded, but back yard is bare soil and needs vegetation re-established
|
BMP Violation | 2/24/2015 | 2/25/2015 | 2/25/2015 | A | PASS |
Evan Jenkins
|
|
|
Roads, curbs and sidewalks have been swept. Some minimal sediment still on sidewalks, but big improvement
|
BMP Violation | 2/24/2015 | 2/24/2015 | 2/24/2015 | P | PEND |
Andy J. Long
|
|
|
CBH reportedly on site in Dropzone cleaning streets and improving conditions at site.
Corrections to be checked for tomorrow morning.
|
BMP Violation | 2/9/2015 | 2/9/2015 | 2/9/2015 | P | PEND |
Andy J. Long
|
|
|
Tim Behrman ###-####
Concrete washout pit provided as requested.
Need to clean up sites on Ardyce for mud clods and loose sediment. Will make another request and escalate if no corrective actions are taken.
|
Site Preparation | 2/5/2015 | 2/5/2015 | 2/5/2015 | A | PART |
Andy J. Long
|
|
|
Phone #: 2089144370 >> Inspection requested via mobile web by Bryan Millar
Permit is posted and most CBH projects within Drop Zone are free of trackout. Approved to start work.
Correction issued: No more site preps approved until a lined concrete washout with a sign is provided. Currently dumping at end of Ardyce and causing trackout and uncontained washout spreading across soil.
Notice given to RP Brett as well as Bryan listed above.
|