General Inspection | 10/2/2015 | 10/2/2015 | 10/2/2015 | | PASS |
Andy J. Long
|
|
|
Construction complete and work area cleaned and stabilized. BLD finaled, ESC conditions satisfied.
|
DOC - Permit Finaled | 10/2/2015 | 10/2/2015 | 10/2/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/17/2015 | 8/17/2015 | 8/17/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Permit sign is posted on job trailer. There are some stockpiles within the site next to the new portion of warehouse.
No trackout, on site storm drain has sediment filter bag installed.
No corrections needed.
|
General Inspection | 7/1/2015 | 7/1/2015 | 7/1/2015 | | PASS |
Andy J. Long
|
|
|
Norco warehouse expansion in progress. No sediment leaving the gated area of costruction/disturbance. No trackout or discharges observed. Approved.
|
Random Inspection | 5/5/2015 | 5/5/2015 | 5/5/2015 | P | PASS |
Andy J. Long
|
|
|
WIP on Norco warehouse demo & expansion. No trackout from site, eco-pan cement washout on site. Sediment and materials well contained within in Norco compound. Parking lot DIs have sediment protection. No corrections needed.
|
Site Preparation | 3/30/2015 | 3/30/2015 | 3/30/2015 | P | PASS |
Andy J. Long
|
|
|
Site prep inspection requested by RP Greg with Petra ###-####
Norco headquarters expansion project is ready to begin. ESC permit posted on job trailer. Work is to connect the two buildings, some site demolition is required. Parking lot is paved and work area surrounded by asphalt so trackout should be easy to manage. Parking lot storm drains have sediment filter bags installed.
Approved.
|