Site Final | 8/1/2016 | 8/1/2016 | 8/1/2016 | P | PASS |
Andy J. Long
|
|
|
Ellington Place subdivision has SFHs in progress by Legacy Home. No fugitive dust , trackout or other issues. All lots except for two are built out. No further subdivison work, individual homes on 23rd Lane have ESC permits for inspection and BMP requirements.
ESC permit conditions satisfied.
|
Aging Inspection | 7/4/2016 | 7/4/2016 | 7/4/2016 | | CANC |
Evan Jenkins
|
|
|
holiday
|
General Inspection | 5/2/2016 | 5/6/2016 | 5/6/2016 | A | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 5/2/2016 | 5/2/2016 | 5/2/2016 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 2/29/2016 | 2/29/2016 | 3/1/2016 | | PASS |
Andy J. Long
|
|
|
No activity. No trackout or discharges. Noticed that asphalt at end of culdesac has sunk and cracked around the sewer manhole.
|
DOC - Permit Finaled | 12/29/2015 | 12/29/2015 | 12/29/2015 | P | PASS |
Andy J. Long
|
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|
Aging Inspection | 12/28/2015 | 12/28/2015 | 12/29/2015 | | PASS |
Andy J. Long
|
|
|
3 homes complete. No active construction in Finally Home sub. No ESC issues or violations observed. DI bags are installed for future construction.
|
Aging Inspection | 10/26/2015 | 10/26/2015 | 10/26/2015 | | PASS |
Evan Jenkins
|
|
|
wip: no issues observed at this time.
|
Aging Inspection | 8/25/2015 | 8/25/2015 | 8/25/2015 | | PASS |
Evan Jenkins
|
|
|
No Issues observed
|
General Inspection | 6/23/2015 | 6/23/2015 | 6/23/2015 | P | PASS |
Andy J. Long
|
|
|
Lots are graded and ready for building. No SFH activity occuring yet. Neighborhood BMPs in good condition. Streets and gutters are free of loose sediment or debris. No corrections at this time.
|
Random Inspection | 5/11/2015 | 5/11/2015 | 5/11/2015 | P | PART |
Andy J. Long
|
|
|
No activity at time of inspection. Road, curbing, and stormdrain has been installed for culdesac (23rd Place). Development now called Ellington Place and has 10 preped parcels for SFHs. No SFH construction yet. No trackout or discharges, street is clean.
1 correction:
Install DI bag at stormdrain at south end of 23rd Place prior to any home construction.
|
General Inspection | 4/13/2015 | 4/13/2015 | 4/13/2015 | P | PASS |
Evan Jenkins
|
|
|
WIP: curb has recently been poured. Grading currently occuring. No ESC issues at this time
|
Site Preparation | 1/20/2015 | 1/20/2015 | 1/20/2015 | P | PASS |
Andy J. Long
|
|
|
Kim Phone #: ###-#### (syman inspector)
Finally Home Again Subdivision (Legacy Development)
Meet Andy with Syman onsite for walk through inspection.
Silt fence perimeter on low end of site is installed properly and in correct locations. SIte is currenty about 2 acres of pasture that will grubbed and graded (no infill required) and utililities installed. Some trench along Smith will occur.
Site is ready for excavation but has two remaining installations: 1. Permit and SWPPP sign at entrance 2. Stabilized construction entrance in the area of mud about 50 yards in from Smith.
Minor trackout from equipment unloading to be cleaned later today.
Approved.
|