Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberESC15-00024
StatusFinaled
Name CHARLEY COOPER
Site Address 1241 E CANDLERIDGE DR
Project NameSFH: 1241 Candleridge Dr.
Customer Number 
ePlanReviewNo
Description
As per ESC conditions, New single family home. Area of Distubance is 8950sq ft.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection3/23/20163/23/20163/23/2016 PASS
DetailsAndy J. Long
Home complete and landscaped. DI bag on Candleridge is now removed. No other actions required. ESC permit finaled.
DOC - Permit Finaled3/23/20163/23/20163/23/2016PPASS
DetailsAndy J. Long
General Inspection3/8/20163/8/20163/8/2016 PEND
DetailsAndy J. Long
need to remove DI bag to final. Home now landscaped.
General Inspection2/22/20162/22/20162/22/2016 PASS
DetailsEvan Jenkins
General Inspection2/5/20162/5/20162/5/2016 CANC
DetailsAndy J. Long
General Inspection1/21/20161/21/20161/21/2016 CANC
DetailsAndy J. Long
General Inspection1/6/20161/6/20161/6/2016 CANC
DetailsAndy J. Long
General Inspection12/22/201512/22/201512/22/2015 PASS
DetailsAndy J. Long
General Inspection12/7/201512/7/201512/10/2015 FAIL
DetailsAndy J. Long
Sediment control wattles and DI bag captured some of the sediment runoff but still evidence of failure and prohibited discharge to DI.

1. Clean collected mud in gutter
2. Empty out and reinstall sediment bag
3. Conduct maintenance on wattles, install more wattles along left side of house.
4. Provide schedule for stabilization/landscaping - permanent or temporary.
General Inspection11/20/201511/20/201511/20/2015 PASS
DetailsAndy J. Long
Construction near complete. Yard is not yet landscaped/stabilized. Perimeter wattles installed and driveway is paved. No trackout or sediment runoff. Sidewalks and employee parking area on street have been swept. No corrections at this time.
General Inspection11/5/201511/5/201511/5/2015 PASS
DetailsEvan Jenkins
No issues observed at this time
General Inspection10/21/201510/21/201510/22/2015 PASS
DetailsAndy J. Long
No activity at site. Driveway apron recently poured, no spills or residues in gutter observed. Trash and materials are contained and cleaned up, no trackout or loose sediment leaving site. Approved.
General Inspection10/6/201510/6/201510/7/2015 PASS
DetailsAndy J. Long
WIP. Sidewalks and gutters are clean. Wattles installed at bottom of disturbed slope. No discharges offsite or uncontained trash/materials. No corrections issued.
General Inspection9/18/20159/18/20159/18/2015 PASS
DetailsEvan Jenkins
No issues observed at this time
BMP Violation9/1/20159/3/20159/3/2015PPASS
DetailsAndy J. Long
2 PM follow-up inspection for BMP violation issued 9/1

RP & home builder onsite for re-inspection.

Stockpiles along front of house and sidewalk were pushed back and the fiber wattle was re-installed along the toe of the slope that is the parcel frontage. Sidewalk and gutter was swept as requested. Drop inlet that receives runoff has sediment filter sack installed and is about 50% full. Requested that RP empty it out this week or next.

Site is back in compliance, corrections made. Approved.
General Inspection9/1/20159/1/20159/1/2015 FAIL
DetailsAndy J. Long
Correction request:

- Implement perimeter sediment controls per ESC plan.
- Alternatively move stockpile to an area where runoff wouldn't transport sediment offsite. Dig sediment trench.

Need to post sign, conduct housekeeping
BMP Violation8/13/20158/14/20158/14/2015APEND
DetailsAndy J. Long
Issued verbal CN to Westminster to install perimeter sediment controls, sweep up sidewalk and gutter, and move stockpile placed precariously ASAP,

Re-inspection to be conducted Tuesday and if site is not in compliace automatic Investigation Fee or SWO depending on conditions.
General Inspection8/13/20158/13/20158/13/2015 FAIL
DetailsAndy J. Long
Dirty sidewalk and gutter, stockpiles placed on top of wattles.

Need cleanup and BMP installation by next week or SWO.
General Inspection7/29/20157/29/20157/29/2015 CANC
DetailsAndy J. Long
General Inspection7/14/20157/14/20157/14/2015 PASS
DetailsAndy J. Long
General Inspection6/24/20156/25/20156/25/2015APART
DetailsAndy J. Long
WIP. No discharges or hillside rills/gullys on or around foothills SFH project.

Correction needed:
sweep up loose sediment and dirt on the sidewalk and gutter in front of house.

Verbal correction request given to Westminster RP
General Inspection6/24/20156/24/20156/24/2015PCANC
DetailsAndy J. Long
rescheduled
General Inspection4/28/20154/28/20154/28/2015PPASS
DetailsAndy J. Long
Site is clean. BMPs installed, permit posted. NO corrections necessary.
Site Preparation3/10/20153/10/20153/10/2015PPASS
DetailsAndy J. Long
Follow up inspection to see that BMPs have been installed and permit posted.

DI in front of project has now been fitted with sediment filter bag. Wattle has been trenched in at toe of slope and edge of sidewalk. Permit onsite.

Approved.
BMP Violation3/6/20153/9/20153/6/2015ACANC
DetailsAndy J. Long
check that BMPs and permit installed on site.
Site Preparation3/6/20153/6/20153/6/2015PFAIL
DetailsAndy J. Long
Excavation started without site prepartion inspection or BMP installation per ESC site plan. No permit posted. Hillside residential project.

Left voicemail on RP that permit and BMPs need to be installed Monday or SWO will be issued until completed.