DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final2/16/20172/16/20172/16/2017PDONE
DetailsMike Jordan
DOC - Permit Finaled2/16/20172/16/20172/16/2017PPASS
DetailsMike Jordan
General Inspection2/8/20172/8/20172/8/2017 CANC
DetailsAndy J. Long
General Inspection1/24/20171/24/20171/26/2017 CANC
DetailsAndy J. Long
General Inspection1/9/20171/9/20171/10/2017 CANC
DetailsAndy J. Long
General Inspection12/23/201612/23/201612/28/2016 CANC
DetailsAndy J. Long
General Inspection12/8/201612/8/201612/8/2016 CANC
DetailsAndy J. Long
General Inspection11/23/201611/23/201611/23/2016 CANC
DetailsAndy J. Long
General Inspection11/8/201611/8/201611/8/2016 CANC
DetailsAndy J. Long
General Inspection10/24/201610/24/201610/24/2016 DEFR
DetailsAndy J. Long
to be closed with BLD final if DI bags have been removed.
General Inspection10/7/201610/7/201610/7/2016 CANC
DetailsAndy J. Long
General Inspection9/22/20169/22/20169/22/2016 CANC
DetailsAndy J. Long
General Inspection8/23/20168/23/20168/23/2016 DEFR
DetailsAndy J. Long
BLD inspector to close ESC permit when all BLD and ESC permit conditions & requirements are satisfied. Both permits still open...
General Inspection8/8/20168/8/20168/8/2016 PEND
DetailsAndy J. Long
Work complete. Layton offsite, some remaining ADA submittals required for BLD sign off. No exterior consruction remaining. Site stabilized and landscaped.

ESC correction to get Final:
- remove sediment filter bags on Gratz and dispose of properly.

note: BLD isnpector to final out ESC with BLD
General Inspection7/22/20167/22/20167/22/2016 PASS
DetailsEvan Jenkins
General Inspection7/7/20167/7/20167/7/2016 PEND
DetailsAndy J. Long
General Inspection6/22/20166/22/20166/22/2016 PEND
DetailsEvan Jenkins
full re-veg
Site Final6/6/20166/7/20166/7/2016APEND
DetailsAndy J. Long
General Inspection6/6/20166/6/20166/6/2016 PASS
DetailsAndy J. Long
General Inspection5/20/20165/20/20165/20/2016 CANC
DetailsAndy J. Long
Site Final5/2/20165/5/20165/5/2016PNR
DetailsAndy J. Long
Still working on final landscaping and temporary stockpile is located on Gratz by Honda. Will need to sweep and remove DI bags. No runoff or spills from site, no fugitve dust. No violations.
General Inspection5/2/20165/2/20165/2/2016 CANC
DetailsAndy J. Long
rescheduled
General Inspection4/15/20164/15/20164/15/2016 PASS
DetailsAndy J. Long
Still working on parking lot paving, lighting, & curbing....No violations, no corrections issued.
General Inspection3/23/20163/31/20164/1/2016PPASS
DetailsAndy J. Long
Check if Gratz needs sweeping and parking lot is done....

WIP on final grading prep for asphalt. Sweeping will be next week. No trackout outside of auto mall area, minor trackout within. DIs have sediment protection.
BMP Violation3/18/20163/21/20163/23/2016APART
DetailsAndy J. Long
Check for sediment check dam bags closer to unfinished parking lot to prevent flow of turbid water down Auto Drive towards Cole.

DI on south side of Gratz has adequate sediment protection. DI on Auto Drive towards Cole has new gravel back check dam.

In process of preparing grading for paving the west parking lot. Some minor trackout. Will need street sweeping on Gratz this weekend.

Will check back next week for conditions and project completion.
General Inspection3/17/20163/18/20163/18/2016PCANC
DetailsEvan Jenkins
Check for sediment check dam bags closer to unfinished parking lot to prevent flow of turbid water down Auto Drive towards Cole.

Rescheduled for Monday 3-21-15
BMP Violation3/16/20163/17/20163/17/2016PPEND
DetailsAndy J. Long
Verbal CN to install check dam filter bags to the east of the access point to the Honda parking lot that is being finished. This will be okay instead of installing DI bag on inlet on Auto Drive that is 1/4 mile from site.

Need to sweep up track out to Gratz.

24 HR compliance time. RP Tony said it will be done ###-####
BMP Violation3/11/20163/14/20163/16/2016AFAIL
DetailsAndy J. Long
Need to verify inlet protection to DI at gratz and auto drive. Contractor removed inlet protection due to plugging up the street with water and did not reinstall inlet protection. Contractor is to install new inlet protection.

No corrections made, muddy water flowing to inlet on Auto Drive.

No workers on site, will follow up tomorrow.

Need to stop sediment closer to site with sandbag check dams. Need to install construciton entrance or prohibit worker parking in the mud.
General Inspection3/11/20163/11/20163/11/2016 FAIL
DetailsTroy James
Inlet protection has been removed by contractor at gratz and auto drive. Spoke with Tony and he will reinstall inlet protection
General Inspection2/25/20162/25/20162/25/2016 PASS
DetailsEvan Jenkins
WIP: no esc issues observed at this time. perm landscaping/re-veg needs to be established
General Inspection2/10/20162/10/20162/10/2016 PASS
DetailsAndy J. Long
Building is mostly complete with some site improvement and utilitiy work in progress. No trackout, no discharges. Auto lot open for business.
General Inspection1/26/20161/26/20161/26/2016 PASS
DetailsEvan Jenkins
General Inspection1/11/20161/11/20161/11/2016 PART
DetailsAndy J. Long
WIP on west side parking lot. Eastern portion and main building area complete and occupied by LM Honda.

Trackout occuring to Gratz from work area and employee parking. Not leaving auto park area, needs to be street swept this week. DI have sediment protection. No other issues.
General Inspection12/25/201512/25/201512/28/2015 CANC
DetailsAndy J. Long
Christmas holiday
General Inspection12/10/201512/10/201512/10/2015 PASS
DetailsEvan Jenkins
No Issues observed at this time
General Inspection11/25/201511/25/201511/25/2015 CANC
DetailsAndy J. Long
General Inspection11/10/201511/10/201511/10/2015 PASS
DetailsAndy J. Long
WIP on south parking lot, north lot finished as well as dealership building shell. Ongoing work on interior. No discharges or sediment runoff from site occuring. Appears all disturbed will covered with paving within the month.
General Inspection10/26/201510/26/201510/26/2015 PASS
DetailsAndy J. Long
WIP at new Honda on interior. No trackout outside of Auto Mall construction areas. No turbid discharges of stormwater from site.
General Inspection10/9/201510/9/201510/9/2015 PASS
DetailsAndy J. Long
WIP on landscaping around perimeter of future car lot. Car lot is only partially paved, sales building is now fully erected and work ongoing in interior. Construction entrance is installed, though there is some trackout to Auto Drive.

Gratz Road and intersection with Auto Drive is also complete and has been swept. No trackout outside of Auto Mall, no discharges, fugitive dust or other issues observed. Approved.
General Inspection9/24/20159/24/20159/24/2015 PASS
DetailsAndy J. Long
WIP on new LHM Honda building. Parking lot has been curbed but is now in process of being graded. Gratz and Auto drive is still not complete and dirt currently. No trackout from auto mall site, no discharges, and no fugitive dust issues. No corrections.
General Inspection9/9/20159/9/20159/9/2015 PASS
DetailsAndy J. Long
General Inspection8/25/20158/25/20158/25/2015 PASS
DetailsAndy J. Long
WIP on new Honda dealership building. All perimeter roads (Gratz & Auto), stormwater infrastructure , and currently under construction. No fugitive dust issues, no trackout to paved streets.

No corrections at this time.
General Inspection8/7/20158/10/20158/10/2015APASS
DetailsAndy J. Long
WIP on new dealearship. Gratz Drive improvements around site are still in progress. New construction entrance installed at site has cut down trackout. Site receives runoff from surrounding drives and parking areas and it is infiltrating on site.

No corrective actions issued.
General Inspection8/7/20158/7/20158/7/2015 CANC
DetailsAndy J. Long
rescheduled for Monday 8/10
General Inspection7/23/20157/23/20157/23/2015 PASS
DetailsAndy J. Long
General Inspection7/8/20157/8/20157/8/2015 PART
DetailsAndy J. Long
Corrections needed:

1. Sweep gutter on west side of Auto drive.
2. Install sandbag sediment trap closer to construction entrance.
3. Do maintenance on DI bag on west side of Auto Drive

Note, Gratz Drive is being extended to Coles and there is quite a bit of loose dirt & sediment within the Auto Mall complex. No sediement or discharges leaving mall, DIs have inlet protection.

Verbal CN issued RP Tony.
General Inspection5/15/20155/15/20155/15/2015PPASS
DetailsAndy J. Long
WIP. Some trackout due to significant rain. No muddy discharges off site. Existing sidewalk and curbing has been preserved to act as sediment containment.

Once conditions dry, the northeast entrance should be swept/cleaned.
Site Preparation4/15/20154/15/20154/15/2015PPASS
DetailsAndy J. Long
Tony ####-####

LH Miller Honda site is prepped for erosion and sediment control.

BMPs include inlet protection on Auto Drive, stabilized construction entrance, and water truck on site for dust suppression.

Permit posted on job trailer by Honda building. Site map and Supervisor Tony (RP) are inside.

Approved.
General Inspection9/7/20169/7/2016   
DetailsMike Jordan