Aging Inspection | 2/8/2016 | 2/8/2016 | 2/8/2016 | | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 2/8/2016 | 2/8/2016 | 2/8/2016 | P | PASS |
Evan Jenkins
|
|
|
Project Complete ESC Conditions Satisfied
|
Aging Inspection | 12/7/2015 | 12/7/2015 | 12/7/2015 | | PASS |
Andy J. Long
|
|
|
WIP on interior. No active earth work occuring. Permeable paving parking on Broad Street now installed. No turbid runoff from site and leakproof washot onsite.
Note - muddy runoff from unpaved alley in between 3rd and 2nd street south of site, not apparently related to construction. DI has sediment bag but is currently backed up.
|
Aging Inspection | 10/6/2015 | 10/6/2015 | 10/6/2015 | | PASS |
Andy J. Long
|
|
|
Minor demo work has occured inside building. No materials or debris outside of building. No earthwork or utility work in ROW occuring. BLD not yet issued.
|
Aging Inspection | 8/6/2015 | 8/6/2015 | 8/6/2015 | | PASS |
Evan Jenkins
|
|
|
|