Aging Inspection | 9/2/2015 | 9/2/2015 | 9/2/2015 | | PART |
Andy J. Long
|
|
|
Home complete, landscaped and occupied. ESC permit conditions satisfied. Will have Brighton pull all DI bags in Mill District Square once all construction is complete. The Square is over 75% complete.
|
DOC - Permit Finaled | 9/2/2015 | 9/2/2015 | 9/2/2015 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 7/2/2015 | 7/2/2015 | 7/2/2015 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 2/20/2015 | 2/23/2015 | 2/23/2015 | A | PASS |
Andy J. Long
|
|
|
Phone #: ###-#### Inspection requested via web by Braxton Hansen
Permit posted. Receiving storm drain inlets have filter protection. Lined washout pit is located in MIll District Square and is at about 40%. Approved for construction/excavation.
|