Bldg J (10) -Type 1 (Elev 4, A-203): Multifamily 4-Plex project consisting of 14 two-story buildings on 3.79 acre site located at 826 N Maple Grove, just north of Emerald. 13 buildings (52 units) will be 2 bedroom, 2 bathroom and 1 building (4 units) will be 1 bedroom, 1 bathroom.

Of the 13, 2 bedroom buildings, the two buildings located adjacent to Maple Grove have a different rear elevation and roof line and are designated as Building Type 3 while the other 2 bedroom buildings are Building Type 1. The 1 bedroom building is designated as Building Type 2.

Since all 14 buildings will be on the same parcel, they will all share the 826 N Maple Grove address. We propose to individually identify each building with a letter (A thru N) as shown on the site plan A-101. Within the plans, the buildings also have a number designation (1 thru 14) for plan referencing.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled3/7/20163/7/20163/7/2016PPASS
DetailsAndy J. Long
All framing is complete. Landscaping and exterior painting in progress. No further ESC inspections on this permit. Main Asheville permit ESC14-01052 and for carports ESC15-01471;open for final clean up and temp BMP removal. No violations at time of inspection.
General Inspection1/22/20161/22/20161/22/2016 PASS
DetailsAndy J. Long
see corrections issued on ESC14-01052. 4 plex in progress at Asheville.
General Inspection12/7/201512/7/201512/7/2015 CANC
DetailsAndy J. Long
General Inspection10/21/201510/21/201510/21/2015 PASS
DetailsEvan Jenkins
No issues at this time
General Inspection9/3/20159/3/20159/3/2015 PASS
DetailsAndy J. Long
WIP at Ashville Commons. No trackout. Access drive to units and parking has been paved and curbed. Foundations and framing have started. No corrections needed at this time.
General Inspection7/17/20157/17/20157/17/2015 PASS
DetailsEvan Jenkins