Permit Information
Permit NumberESC15-00142
StatusFinaled
Name REN NELSON
Site Address 613 N MORNINGSIDE WAY
Project Name Morningside SFH (GRD & BLD)
Customer Number 
ePlanReviewNo
Description
ESC permit to cover residential rough grading permit and BLD for SFH. ESC site map and narrative submitted. BMPS include trackout control with stabilized entrance, downslope perimeter wattles, inlet protection for MS4 and onsite stormdrains (to be constructed) as well a protection for the drainage swales. Site prep/pre-construction inspection is required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final4/25/20174/25/20174/25/2017PPASS
DetailsMelissa Jannusch
Project is complete. Soil is stable. Temporary BMPs are removed. Okay to final.
General Inspection4/24/20174/24/20174/25/2017 PASS
DetailsMelissa Jannusch
Project is complete. Soil is stable. Temporary BMPs are removed. Okay to final.
General Inspection4/7/20174/7/20174/7/2017 CANC
DetailsMelissa Jannusch
General Inspection3/23/20173/23/20173/23/2017 PASS
DetailsMelissa Jannusch
WIP on interior. No ESC issues.
General Inspection3/8/20173/8/20173/8/2017 PASS
DetailsMelissa Jannusch
BLD permit still open. No ESC violations observed
General Inspection2/21/20172/21/20172/23/2017 PASS
DetailsMelissa Jannusch
okay to final
General Inspection2/6/20172/6/20172/8/2017 PASS
DetailsMelissa Jannusch
Driveway complete. WIP on interior. No activity on backside slope. No ESC corrections.
General Inspection1/5/20171/5/20171/10/2017 CANC
DetailsAndy J. Long
General Inspection12/21/201612/21/201612/27/2016 CANC
DetailsAndy J. Long
General Inspection12/6/201612/6/201612/9/2016 CANC
DetailsAndy J. Long
General Inspection11/21/201611/21/201611/21/2016 PASS
DetailsAndy J. Long
WIP on interior and preparing base to install driveway pavers. No trackout issues, workers parked on street No construction acitivity on slope below retaining wall.
Random Inspection11/4/201611/4/201611/4/2016PPASS
DetailsDaryl Spivey
Area clean
General Inspection11/3/201611/3/201611/3/2016 CANC
DetailsAndy J. Long
General Inspection10/19/201610/19/201610/20/2016 PASS
DetailsAndy J. Long
General Inspection10/4/201610/4/201610/6/2016 CANC
DetailsAndy J. Long
General Inspection9/19/20169/19/20169/19/2016 CANC
DetailsAndy J. Long
General Inspection9/2/20169/2/20169/2/2016 PASS
DetailsEvan Jenkins
work in progress
no issues observed
General Inspection8/18/20168/18/20168/18/2016 PASS
DetailsEvan Jenkins
General Inspection8/3/20168/3/20168/4/2016 PASS
DetailsEvan Jenkins
General Inspection7/19/20167/19/20167/20/2016 PASS
DetailsAndy J. Long
WIP. DI protectection was re-installled on Morningside. No trackout. No activity or issues on hillside below large wall.
General Inspection7/4/20167/4/20167/4/2016 CANC
DetailsEvan Jenkins
holiday
General Inspection6/17/20166/17/20166/17/2016 PART
DetailsAndy J. Long
Some trackout is occuring by landscaping crew. Need to sweept street, sidewalk and gutter.

Need to remove broken gravel bag at inlet and change out the filter bag.
General Inspection6/2/20166/2/20166/3/2016 PASS
DetailsEvan Jenkins
General Inspection5/18/20165/18/20165/18/2016 PASS
DetailsAndy J. Long
WIP. No trackout. No hillside erosion issues observed below house retaining wall installation. DI on Morningside had sediment filter bag
General Inspection5/2/20165/3/20165/3/2016APASS
DetailsAndy J. Long
General Inspection4/29/20164/29/20165/2/2016 CANC
DetailsAndy J. Long
rescheduled
General Inspection4/14/20164/14/20164/15/2016 PASS
DetailsAndy J. Long
General Inspection3/29/20163/30/20163/30/2016PPASS
DetailsAndy J. Long
No trackout. Permit sign posted on sidewalk. Apron and gutter were swept. No new corrections. New rock entrance will be installed when the haul out will occur.
General Inspection3/28/20163/28/20163/29/2016 CANC
DetailsAndy J. Long
rescheduled for 3/30
General Inspection3/11/20163/11/20163/17/2016 PART
DetailsAndy J. Long
WIP. Some trackout occurring from the muddy driveway.

Verbal CN issued to RP Ren to have more rock installed for construction entrance. He stated he will have rock installed by tomorrow or Monday. He also stated that there will be significant truck activity next week due to retaining wall removal.
General Inspection2/25/20162/25/20162/25/2016 PASS
DetailsEvan Jenkins
General Inspection2/10/20162/10/20162/10/2016 PASS
DetailsAndy J. Long
WIP. No activity on hillside below wall. No erosion and drainage issues observed. No trackout. No corrections at this time.
General Inspection1/26/20161/26/20161/26/2016 PASS
DetailsAndy J. Long
WIP on frame. No earthwork activity. No trackout. Workers parking on street. Permit sign posted.
General Inspection1/11/20161/11/20161/12/2016 PASS
DetailsEvan Jenkins
General Inspection12/25/201512/25/201512/29/2015 CANC
DetailsAndy J. Long
General Inspection12/10/201512/10/201512/11/2015 CANC
DetailsAndy J. Long
General Inspection11/25/201511/25/201511/25/2015 PASS
DetailsAndy J. Long
Framing now in progress. Earthwork and concrete work is complete. No trackout. No erosion issues currently below installed retaining wall. Approved.
General Inspection11/10/201511/10/201511/10/2015 PASS
DetailsAndy J. Long
WIP. No trackout, construction entrance installed for heavy equipment; employee parking is on the street. No erosion issues observed below site.
General Inspection10/26/201510/26/201510/26/2015 PASS
DetailsAndy J. Long
General Inspection10/9/201510/9/201510/12/2015 PASS
DetailsAndy J. Long
WIP. Foundation and concrete work for pool, home, and site walls is complete. Construction entrance is installed and no trackout.

Discussed erosion control on area below cement wall - rock chip material is to be installed below to protect the area and provide ground cover. RP-GC also noted that the cement wall will be painted/colored to match the hillside colors. No violations at site. No corrections issued at this time.
General Inspection9/24/20159/24/20159/24/2015 PEND
DetailsAndy J. Long
WIP on home and pool foundation. Extensive concrete work has been completed. Washout conducted on spots around site. No discharge or runoff observed. Construction entrance is preventing trackout.

No current issues, but still need to consider erosion control blankets below the wall to protect foundation and prevent hillside erosion.
Conference9/8/20159/9/20159/9/2015PCANC
DetailsAndy J. Long
General Inspection9/8/20159/8/20159/8/2015 PART
DetailsAndy J. Long
Trackout to Morningside needs to be swept up and construction entrance re-inspected and maintained as necessary.

Need to schedule conference regading preventive erosion control on slopes below the retaining wall built into the rock.
General Inspection8/18/20158/18/20158/19/2015 PASS
DetailsAndy J. Long
General Inspection8/3/20158/3/20158/3/2015 PASS
DetailsAndy J. Long
WIP. Permit sign posted at entrance, no trackout or discharges to Morningside.

Concrete wall has been constructed around the perimeter of site and forms a structural sediment control barrier around the disturbed area. No recent complaints or issues at site. No work occuring below hillside and rocky cliff area.
General Inspection6/24/20156/24/20156/24/2015PPASS
DetailsAndy J. Long
No sediment trackout from site on Morningside. Cement retaining wall has been installed, no erosion or washouts observed along base of wall. Permit posted. No complaints received from neighbors in regards to dust or other issues. No corrections at this time.
General Inspection4/29/20154/29/20154/29/2015PPASS
DetailsAndy J. Long
Construction entrance has been installed as requested 4/21 . RP explained concrete washout containers will be brought on site once foundation and paving work begins. Site BMPs are in good condition. Approved.
Complaint Inspection4/21/20154/21/20154/21/2015PPART
DetailsAndy J. Long
Complaint received reporting inadequare BMPs on site. Due to rock cliff, wattles and silt fence are unable to be trenched. Wattles currently weighed down/secured by sandbags - acceptable alternative, no sediment leaving area of disturbance.

No activity at time of inspection; permit posted and ESC plan onsite.

Corrections:
1. Install rock construction entrance to control dust from vehcle traffic; trackout control. Listed on ESC site map.

2. Provide washout onsite prior to any concrete work/pool installation.

Written notice posted. Call RP Todd to notify.
General Inspection3/31/20153/31/20153/31/2015PPASS
DetailsAndy J. Long
No earthwork has occured yet. BMPs installed, permit posted. No issues at site.
Site Preparation3/4/20153/5/20153/5/2015APASS
DetailsAndy J. Long
Olivia - Phone #: ###-####

9:30

Site inspection conducted with RP and SWPPP designer. Permit is posted a plans are onsite. Perimeter sediment control is installed properly, the wattle is weighed down with sand bags in areas where the rock surface prevented trenching and staking.

The existing driveway is sandy with some rocky road mix and should not trackout too easiliy. To start, the construction entrance is waived due to planned utility trenching in early phase of project so will monitor conditions and request entrance if trackout is a problem.

The pool and retaining walls will be built first moveing from back of lot to the front.

Site is ready for excavation.
Site Preparation3/4/20153/4/20153/4/2015PCANC
DetailsAndy J. Long
Olivia-please call to meet Phone #: ###-####

Rescheduled by RP for tomorrow at 9:30
General Inspection1/20/20171/20/2017   
DetailsMelissa Jannusch