Site Final | 4/22/2015 | 4/23/2015 | 4/23/2015 | A | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 4/23/2015 | 4/23/2015 | 4/23/2015 | P | PASS |
Jim Sly
|
|
|
|
Site Preparation | 3/2/2015 | 3/3/2015 | 3/3/2015 | P | CANC |
Andy J. Long
|
|
|
Tim Phone #: ###-####
Already approved for construction.
|
Site Preparation | 3/2/2015 | 3/2/2015 | 3/2/2015 | P | PASS |
Evan Jenkins
|
|
|
Tim Phone #: ###-####// please call before
|
Site Preparation | 2/20/2015 | 2/25/2015 | 2/25/2015 | P | CANC |
Evan Jenkins
|
|
|
cancel per Tim 2-23-15 blh // Phone #: ###-####
|