Site Final | 11/12/2015 | 11/12/2015 | 11/12/2015 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 11/12/2015 | 11/12/2015 | 11/12/2015 | P | PASS |
Jim Sly
|
|
|
|
Aging Inspection | 9/30/2015 | 9/30/2015 | 9/30/2015 | | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 7/31/2015 | 7/31/2015 | 7/31/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Permit posted. No trackout or discharges observed.
|
Site Preparation | 3/12/2015 | 3/12/2015 | 3/12/2015 | P | PASS |
Evan Jenkins
|
|
|
Permit Posted in front yard next to backyard access road. Contractor is going to attempt to have concrete truck take washout back to their yard. If that doesn't work, he stated he will provide a leak proof washout
|