General Inspection | 4/14/2016 | 4/14/2016 | 4/14/2016 | | PASS |
Andy J. Long
|
|
|
Home complete, landscaped, and occupied. Hillside banks around yard have been hydroseeded. No loose sediment or materials on site. ESC permit satisfied
|
DOC - Permit Finaled | 4/14/2016 | 4/14/2016 | 4/14/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/30/2016 | 3/30/2016 | 3/30/2016 | | PASS |
Andy J. Long
|
|
|
SFH near completion, some work still in progress, including final landscaping. BLD open. No corrections at this time.
|
General Inspection | 3/15/2016 | 3/15/2016 | 3/15/2016 | | PEND |
Evan Jenkins
|
|
|
landscaping/perm re-vegetation establishment
|
General Inspection | 2/29/2016 | 2/29/2016 | 2/29/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/12/2016 | 2/12/2016 | 2/12/2016 | | PASS |
Andy J. Long
|
|
|
Home complete and occupied. Working on retaining wall and yard not yet landscaped. No sediment runoff or trackout. No corrections issued.
|
General Inspection | 1/28/2016 | 1/28/2016 | 1/29/2016 | | PASS |
Andy J. Long
|
|
|
Home compete and occupied. Not yet landscaped. No sediment leaving site, will monitor till adequate stabilization.
|
General Inspection | 1/13/2016 | 1/13/2016 | 1/13/2016 | | PART |
Andy J. Long
|
|
|
WIP.
Corrections: - pick up windblown trash in street - sweep up trackout from driveway and open lot across street that used for parking or turn around by subcontractors.
|
General Inspection | 12/29/2015 | 12/29/2015 | 12/29/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no ESC issues observed at this time
|
General Inspection | 12/14/2015 | 12/14/2015 | 12/14/2015 | | PASS |
Andy J. Long
|
|
|
Home near completion. No earthwork occuring. No sediment runoff, uncontained trash or materials or other issues. Approved.
|
General Inspection | 11/27/2015 | 11/27/2015 | 11/27/2015 | | PASS |
Bill VanDegrift
|
|
|
|
General Inspection | 11/12/2015 | 11/12/2015 | 11/12/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/28/2015 | 10/28/2015 | 10/28/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/13/2015 | 10/13/2015 | 10/13/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Near completion. Yard is not yet stabilized. No sediment leaving site, no stormwater pollution sources uncontained on site observed.
|
General Inspection | 9/28/2015 | 9/28/2015 | 9/28/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 9/10/2015 | 9/10/2015 | 9/10/2015 | | PART |
Andy J. Long
|
|
|
WIP. Frame is up but interior and exterior work remains. Yard is not yet stabilzed or landscaped but surrounded by perimeter silt fence on the downhill sides. Limits of clearing have been observed and no hillside erosion from site runoff observed. No trackout or spills.
Corrections: -pick up wind blown trash in backyard and outside of silt fence - retrench silt fence in areas where it has come up.
|
Complaint Inspection | 4/16/2015 | 4/16/2015 | 4/16/2015 | P | PEND |
Andy J. Long
|
|
|
Dust complaint received from recently stockpiled soils from this home's basement at the end of Ridgecrest.
Correction request to tacify, mulch, or hydroseed loose piles that will remain on site.
|
Site Preparation | 4/9/2015 | 4/10/2015 | 4/10/2015 | A | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 4/9/2015 | 4/9/2015 | 4/9/2015 | P | CANC |
Andy J. Long
|
|
|
rescheduled for tomorrow. Requested that permit be posted and hillside BMPs be installed.
|