Site Final | 9/14/2015 | 9/15/2015 | 9/15/2015 | A | PASS |
Andy J. Long
|
|
|
Ross Phone #: ###-####
Construction complete. TO given for Zoo Boise gift shops, and is only conditional upon some outdoor lighting fixtures. Grass in distrurbed area that was seeded has established well. ESC permit conditions complete, clear to take down permit sign. No further inspections necessary.
|
General Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 | A | PASS |
Andy J. Long
|
|
|
WIP. Gift shop building is complete. Some exterior work remaining. Area will not be able to be vegetated till next Spring most likely per Craig Stevens Zoo Boise Facility Manager.
No stormwater pollution issues observed.
|