Site Final | 7/29/2015 | 7/29/2015 | 7/29/2015 | P | PASS |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 7/29/2015 | 7/29/2015 | 7/29/2015 | P | PASS |
Phil Shearer
|
|
|
|
Site Preparation | 4/7/2015 | 4/8/2015 | 4/8/2015 | A | NR |
Andy J. Long
|
|
|
Phone #: ###-#### Inspection requested via web by Austin Wagner
Permit posted. DH #12 stormwater inlets have coir mat protection.
Corrections:
1. Provide lined washout pit (current pit does not have a lining, but is containing cement washout from streets/gutters) 2. Conduct meeting with sub-contractors to resist urge to drive on mud on adjacent lots. Trackout is beginning to accumulate. Parking should be on paved areas. Mud clods should be scraped at end of day work.
Approved to start but other new site preps will be failed without corrections.
|