Site Final | 11/17/2015 | 11/17/2015 | 11/17/2015 | P | PASS |
Andy J. Long
|
|
|
Exterior work on all 14 townhomes in development is complete, some units occupied. Common areas are landscaped and stabilized.
All ESC permits finaled except for 2703 Malad (ESC15-00267) and main sub permit ESC14-00892 with request to Gary Olson to sweep up after dumpster removal and to remove DI bag installed at the south stormdrain of the block.
|
General Inspection | 9/28/2015 | 9/29/2015 | 9/28/2015 | A | PASS |
Rex Boyles
|
|
|
no tracking, looks good
|
Aging Inspection | 9/15/2015 | 9/15/2015 | 9/15/2015 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 4/9/2015 | 4/14/2015 | 4/14/2015 | A | PASS |
Andy J. Long
|
|
|
Nate Phone #: ###-####
Bella Vista townhome project on Malad Street. 14 townhomes, 7 on each side of the newly developed square/block.
ESC permit issued for each BLD permit per townhome.
BMPs include permit signage, DI protection on subdivision storm drain and new inlet on Malad (west) of construction. Concrete washout pit has been excavated. RP Gary will line with visqueen on Wednesday. Concrete work will be Thursday or Friday.
The project will be phased - 7 homes on the east side will have their foundations started. Once in progress, the 7 other townhomes will have the foundations poured.
Discussed other BMPs that will be necessary including trash enclosures, trackout sweep up, stockpile control/placement, and having workers park on paved surfaces.
Approved to start to relocate misplaced sewer stub line. Subdivision ESC permit is ESC14-00892
|
Site Preparation | 4/10/2015 | 4/14/2015 | 4/13/2015 | A | CANC |
Andy J. Long
|
|
|
Malad townhomes..
duplicate inspection entry
|
Site Preparation | 4/8/2015 | 4/10/2015 | 4/10/2015 | A | CANC |
Andy J. Long
|
|
|
Gary Phone #: ###-####
Rescheduled for Tuesday 4/14
|