Permit Information
Permit NumberESC15-00282
StatusFinaled
Name RANDY REUTZEL
Site Address 4400 E WOLF TREE ST
Project NameDallas Harris Estates # 13
Customer Number 
ePlanReviewNo
Description
New 5 Acre Subdivision: Installation of underground utilities, paved roads, sidewalks, curb and gutter in preparation for residential housing on individual lots. An existing irrigation ditch is located at the north end of the site and as part of this project it will be piped.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection3/28/20163/28/20163/29/2016 PASS
DetailsAndy J. Long
WIP on SFHs by Tahoe and Hunter. Temp BMPs to maintained and removed upon completion. Active grading in progress now for Dallas Harris Estates #14. No further ESC inspections on this permit, Knife River no longer on-site.
DOC - Permit Finaled3/29/20163/29/20163/29/2016PPASS
DetailsAndy J. Long
General Inspection2/25/20162/25/20162/25/2016 PASS
DetailsEvan Jenkins
General Inspection1/25/20161/25/20161/25/2016 PASS
DetailsAndy J. Long
SFHs in progress by Hunter and Tahoe Homes. New subdivision storm water drain have inlet protection. Syman Co stated that all inlets are being maintained or replaced this week.

No discharges; no trackout out of subdivision.
General Inspection12/25/201512/25/201512/28/2015 CANC
DetailsAndy J. Long
Christmas holiday
General Inspection11/24/201511/24/201511/24/2015 CANC
DetailsAndy J. Long
General Inspection10/23/201510/23/201510/23/2015 PASS
DetailsAndy J. Long
No activity
General Inspection9/17/20159/17/20159/17/2015 PASS
DetailsAndy J. Long
Construction complete and new DIs fitted with sediment bags. No Knife River equipment or materials left on site. Tahoe and Hunter should begin work on this new block this Fall. Lots have been graded and prepped for SFH construction.
Random Inspection7/8/20157/8/20157/8/2015PPASS
DetailsAndy J. Long
Paving and curbing has been completed and Knife River has moved all equipment offsite. All new stormwater infrastructure has been fitted with sediment protection. No vertical construction occuring.

Approved.
BMP Violation5/26/20155/26/20155/26/2015PPEND
DetailsAndy J. Long
Inlets on Wolf Tree were not fitted with DI bags, initial correction with DI bags were put in different inlets in DHE #12.

Called to request to clean out mud and dirt in and around inlet and to install 4 new DI bags on the 4 DIs on Wolf Tree directly in front of entrance to work site.

Randy from Knife River called to confirm that he has started the cleaning and DI bags will be installed tomorrow. Will check tomorrow PM on condition.
General Inspection5/7/20155/7/20155/7/2015PPART
DetailsAndy J. Long
Coir fiber inlets on Wolf Tree in front of project have trapped a lot of sediment but are not adequately filtering the water and are partially damaged.

CN issued to RP Randy via phone:
After rain and runoff has stopped, need to shovel and clean gutters surrounding inlets. Replace with sediment filter bags, no more fiber mats since they are no durable enough for this application.

No trackout or other issues. Work has temporarily stopped during the rain event
BMP Violation4/27/20154/27/20154/27/2015PPART
DetailsAndy J. Long
No significant trackout from active DH Estates #13. Water truck onsite for compaction purposes as well as dust suppression as needed

Verbal correction request to Knife River RP to replace all damaged fiber inlet covers around that would receive runoff from streets surrounding #13.

Note - inlet fiber mats on DHE #12 are also damaged or absent completely. SFHs are now in progress in this area so working to have builders (Tahoe and Hunter) and developer have the inlets installed with sediment protection that won't be damaged construction traffic or sweepers