Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberESC15-00320
StatusFinaled
Name SHANE HOPKINS
Site Address 5237 E SAWMILL WAY
Project NameBARBER MILL ESTATES
Customer Number 
ePlanReviewNo
Description
Excavation of wet bio-solids layer within the abandoned Golden Acres wastewater settling pond. Excavated material will be lined out in rows within another section of the pond area to speed up the drying process. Materials will not be off-hauled at this time and no new soil delivered. All work to be performed within the bermed/contained pond area. Despite proximity to River, low risk of offsite discharges.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection4/11/20164/11/20164/11/2016 PASS
DetailsAndy J. Long
Work complete in old bio-solids pond. No further work to be conducted on this permit. No ESC issues, permit conditions satisfied. RP Shane confirmed work was complete under the scope of the project and was notified the permit has been finaled. Future work may occur at site under a different project.
DOC - Permit Finaled4/11/20164/11/20164/11/2016PPASS
DetailsAndy J. Long
General Inspection3/25/20163/25/20163/25/2016 PASS
DetailsAndy J. Long
No activity. Work to resume later this Spring. No corrections needed.
General Inspection3/10/20163/10/20163/10/2016 PASS
DetailsAndy J. Long
General Inspection2/24/20162/24/20162/24/2016 PASS
DetailsAndy J. Long
No activity, no violations. Project not complete but is currently inactive.
General Inspection2/9/20162/9/20162/9/2016 PASS
DetailsAndy J. Long
No activity. No issues.
General Inspection1/25/20161/25/20161/25/2016 PASS
DetailsAndy J. Long
No activity. Work still remaining in spring per RP. No sediment or stormwater leaving site.
General Inspection1/8/20161/8/20161/8/2016 PASS
DetailsAndy J. Long
General Inspection12/24/201512/24/201512/24/2015 PASS
DetailsAndy J. Long
No activity. Site retains all stormwater
General Inspection12/9/201512/9/201512/9/2015 PASS
DetailsAndy J. Long
No activity at site currently
General Inspection11/24/201511/24/201511/24/2015 PASS
DetailsAndy J. Long
No acitivity at this time. No trackout or sediment runoff at site.
General Inspection11/9/201511/9/201511/10/2015 PASS
DetailsAndy J. Long
No activity at time of inspection. RP onsite inspecting after rains. Work will resume after asbestos pipe abatement is complete. No corrections needed at this time.
General Inspection10/23/201510/23/201510/23/2015 PASS
DetailsAndy J. Long
No construction activity in old waste treatment pond at time of inspection. No trackout from entrance. Permits posted.
General Inspection10/7/201510/7/201510/7/2015 PASS
DetailsAndy J. Long
General Inspection9/21/20159/21/20159/21/2015PPASS
DetailsAndy J. Long
Work has resumed at biosolids/waste pond remediation & reclamation project. Permits posted on fence by entrance. No trackout or offsite discharges. No fugitve dust observed. Approved.
Aging Inspection8/20/20158/20/20158/20/2015 PASS
DetailsAndy J. Long
No acitivity. SWPPP/CGP still active and permit posted. Work may resume on site. No issues.
Random Inspection4/3/20154/3/20154/3/2015PPASS
DetailsAndy J. Long
Work is temporarily on hold. First section of biosolids has been moved and set out to dry. Work will continue again in a week or two per RP Shane. Permit is posted. No issues on site. Approved.
Site Preparation3/24/20153/25/20153/25/2015APASS
DetailsAndy J. Long
Shane Phone #: ###-####

Permit posted on gate to old settling pond. Site will use existing construction entrance for Terraces laydown yard.

Will excavate top levels of biosolids in north settling pond to dry out in rows in the south pond. Site has existing earthen berm (abandoned wastewater settling ponds) surrounding entire site creating a sediment barrier. No material will leave site at this time. Once dry, materials will be hauled to dump.

Main BMP will be dust control when disturbing topsoil. Approved. Operation to begin next week.