Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberESC15-00339
StatusFinaled
Name GREG BAISCH
Site Address 1121 N ORCHARD ST
Project NameU-HAUL STORAGE AND RENTAL FACI
Customer Number 
ePlanReviewNo
Description
Building of Climate Controlled Storage Facility
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final10/31/201610/31/201611/2/2016PPASS
DetailsJim Sly
DOC - Permit Finaled11/2/201611/2/201611/2/2016PPASS
DetailsJim Sly
Site Final10/13/201610/13/201610/13/2016ANR
DetailsAndy J. Long
Construction complete pending some interior work and BLD permit requirements. Parking lot and onsite storm water system installed.

Correction request:
- Remove temporary DI bag installed on MS4 on Gage Street. Correction issued to Petra
General Inspection9/12/20169/12/20169/12/2016 PASS
DetailsEvan Jenkins
General Inspection7/28/20167/28/20167/28/2016APASS
DetailsAndy J. Long
Storage structure foundation complete. Very clean perimeter. No trackout to Gage, large Compliance Solutions concrete washout onsite.

No violations, no corrections needed
General Inspection6/29/20166/29/20166/29/2016APASS
DetailsAndy J. Long
WIP on storage unit. Construction entrance and DI protection installed on Gage. No loose sediment on Orchard sidewalk. Site is in good condition
General Inspection6/6/20166/6/20166/6/2016 PASS
DetailsAndy J. Long
WIP. Site perimeter is free of trackout and discharges. Inlet bags installed on Gage. No corrections issued.
General Inspection4/19/20164/19/20164/19/2016 PASS
DetailsAndy J. Long
WIP. No sediment runoff. Slab for warehouse is complete, concrete washout contained. No trackout from site entrances. Approved.
General Inspection3/4/20163/4/20163/4/2016 PASS
DetailsAndy J. Long
Minor activity on site utilities. Parcel has been graded and prepped but no vertical work in progress. Petra still on site. Orchard and Gage street are clean. No trackout or sediment runoff. Silt fence installed along south property line.

No corrections.
General Inspection1/18/20161/18/20161/19/2016 PASS
DetailsAndy J. Long
WIP. BMPs installed/implemented. No trackout or discharges on Orchard. Approved.
General Inspection12/1/201512/1/201512/1/2015 PASS
DetailsAndy J. Long
WIP. Site grading and utility connection work is complete. No vertical construction or paving yet. Access to site is off Gage Street and is restricted on Orchard.

No trackout or discharges coming from site observed. Approved.
General Inspection10/15/201510/15/201510/15/2015PPASS
DetailsAndy J. Long
General Inspection9/22/20159/22/20159/22/2015 PASS
DetailsAndy J. Long
Permit sign posted on Orchard access. No trackout. No fugitive dust. Approved.
General Inspection7/21/20157/21/20157/21/2015APASS
DetailsAndy J. Long
Old storage unit structures have been demolished and hauled away. Dump trucks are currently bringing in fill dirt and grading is in progress. Trucks are entering on Orchard and pulling out on Gage where construction entrance is. Permit sign and SWPPP info posted. No fugitive dust or other violations observed, no corrections at this time.
Site Preparation6/23/20156/23/20156/23/2015PPART
DetailsEvan Jenkins
Rex ###-####

Permit was issued up front Prior to ESC Reviewing and Approving the ESC Plan. Demo Began prior to Site Prep Inspection. Permit was being posted when I pulled up to perform the Inspection.
More training needs to occur within the permitting group. Di Protection Installed. Permit posted along Orchard. Project occuring along Gage St.
Site Preparation6/23/20156/23/20156/23/2015PCANC
DetailsEvan Jenkins
Rex Phone #: ###-####

Need Demo BMP Permit Prior to any work to occur. This has been disclosed to applicant