Site Final | 8/12/2015 | 8/12/2015 | 8/12/2015 | P | PASS |
Andy J. Long
|
|
|
Construction complete. Home is landscaped and occupied. Temp BMPs in Peppermill to remain for ongoing SFH construction. CBH keeping site in compliance.
|
General Inspection | 5/14/2015 | 5/14/2015 | 5/14/2015 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 4/22/2015 | 4/22/2015 | 4/22/2015 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 4/16/2015 | 4/16/2015 | 4/16/2015 | P | PASS |
Andy J. Long
|
|
|
Brett Phone #: ###-####
Permit posted. Peppermill sub BMPs installed and lots ready for excavation. Trash container provided. Lined cement washout has remaining capacity and is being utilized.
|