Site Final | 10/28/2015 | 10/28/2015 | 10/28/2015 | P | PASS |
Eric Story
|
|
|
final ok
|
Aging Inspection | 10/21/2015 | 10/21/2015 | 10/21/2015 | | PASS |
Andy J. Long
|
|
|
Home near completion. WIP on interior and is not yet landscaped. Trash contained, no sediment leaving home lot.
Sweeping and cleanup is in progress in RH #6 due to trackout from cement trucks along Signal Rock and some runoff during the weekend rain.
|
Site Preparation | 5/13/2015 | 5/13/2015 | 5/13/2015 | P | PASS |
Andy J. Long
|
|
|
Permit signs posted. Drop inlets protected. First 4 homes to start in River Heights #6. Excavation to start today. Cement work next week. RP Erbie on site to discuss.
Designated lined washout will installed this week at culdesac on Playwright. Approved
|