Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberESC15-00378
StatusFinaled
Name BRIAN F BAKER
Site Address 3119 N 26TH ST
Project NameBaker foothills home
Customer Number 
ePlanReviewNo
Description
Homeowner is GC and RP; ESC site map and SWPPP plan designed for site. BMPs include preservation of existing vegetation, staying within clearing limits, stabilized construction entrance, stabilization and temporary ESC BMPs on disturbed slopes, drop inlet protection, and proper waste management including leakproof concrete and liquid byproduct waste washout. SITE PREPARATION INSPECTION required; call 384-3802 to schedule
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final4/4/20174/4/20174/4/2017PPASS
DetailsAndy J. Long
Rear hillside vegetation > 70% coverage. Home occupied and homeowner doing gardening/landscaping. Front driveway vegetation still establishing, area is confined with retaining wall. No temp BMPs in ROW. No further ESC inspections, permit finaled.
General Inspection4/4/20174/4/20174/4/2017 PASS
DetailsAndy J. Long
General Inspection3/20/20173/20/20173/20/2017 PASS
DetailsMelissa Jannusch
Vegetation phase. Vegetation has not reached 70% cover. Project ok.
General Inspection3/3/20173/3/20173/3/2017 PEND
DetailsAndy J. Long
revegetation phase...
General Inspection2/16/20172/16/20172/21/2017 CANC
DetailsMelissa Jannusch
General Inspection2/1/20172/1/20172/1/2017 PASS
DetailsMelissa Jannusch
Building finaled. Snow covered conditions cannot determine if final stabilization has been reached. No corrections.
General Inspection1/17/20171/17/20171/20/2017 CANC
DetailsAndy J. Long
General Inspection1/2/20171/2/20171/3/2017 CANC
DetailsAndy J. Long
General Inspection12/16/201612/16/201612/16/2016 CANC
DetailsAndy J. Long
General Inspection12/1/201612/1/201612/1/2016 CANC
DetailsAndy J. Long
General Inspection11/16/201611/16/201611/16/2016 PASS
DetailsAndy J. Long
BLD finaled. Hillside areas around home have been recently hydroseeded, grass not yet established. Driveway installed, no sediment runoff to 26th.
General Inspection11/1/201611/1/201611/2/2016 CANC
DetailsAndy J. Long
hillside revegetation occuring. BLD finaled, home occupied. No inspection
General Inspection10/17/201610/17/201610/17/2016 CANC
DetailsAndy J. Long
General Inspection9/30/20169/30/20169/30/2016 CANC
DetailsAndy J. Long
General Inspection9/15/20169/15/20169/16/2016 CANC
DetailsAndy J. Long
General Inspection8/31/20168/31/20168/31/2016 PASS
DetailsEvan Jenkins
General Inspection8/16/20168/16/20168/16/2016 PASS
DetailsEvan Jenkins
General Inspection8/1/20168/1/20168/1/2016 PASS
DetailsAndy J. Long
Home structure and footprint is complete, WIP on interior and finishing touches. Driveway and yard landscaping/stabilization is not yet complete.

No trackout or sediment running down 26th Street to Hill. The DI bag on Hill Road is still installed and will need to be removed upon stabilization of driveway. Permit sign posted.
General Inspection7/15/20167/15/20167/15/2016 PASS
DetailsEvan Jenkins
No issues observed at this time
General Inspection6/30/20166/30/20166/30/2016 PASS
DetailsEvan Jenkins
General Inspection6/15/20166/15/20166/16/2016 PASS
DetailsEvan Jenkins
No Issues observed
General Inspection5/31/20165/31/20165/31/2016 PASS
DetailsEvan Jenkins
General Inspection5/16/20165/16/20165/16/2016 PASS
DetailsEvan Jenkins
General Inspection4/29/20164/29/20164/29/2016 CANC
DetailsAndy J. Long
General Inspection4/14/20164/14/20164/14/2016 PEND
DetailsEvan Jenkins
re-vegetation needs to occur via sod/landscaping
General Inspection3/30/20163/30/20163/30/2016 PASS
DetailsEvan Jenkins
General Inspection3/15/20163/15/20163/16/2016 PASS
DetailsAndy J. Long
WIP. Will need to stabilize disturbed road shoulder downhill from driveway. No trackout. Hillside BMPs installed. Runoff down to Hill Road is clear.

Note: Pre-existing DI bag is full of dirt and leaves Will make note to ACHD maintenance crew
General Inspection2/29/20162/29/20163/1/2016 PART
DetailsAndy J. Long
Need to sweep up some trackout and loose dirt coming off driveway slope. Hillside BMPs are in good condtion.

Perform maintenance on the DI bag on HIll Road. Will check in with RP next inspection.
General Inspection2/12/20162/12/20162/12/2016 PASS
DetailsEvan Jenkins
No issues observed at this time
General Inspection1/28/20161/28/20161/28/2016 PASS
DetailsEvan Jenkins
General Inspection1/13/20161/13/20161/13/2016 PASS
DetailsEvan Jenkins
General Inspection12/29/201512/29/201512/29/2015 PASS
DetailsEvan Jenkins
General Inspection12/14/201512/14/201512/14/2015 PASS
DetailsAndy J. Long
WIP on frame. Hillside wattles to southwest of home are installed and vegetatation has been preservd above and below. DI bag installed on Hill Road to capture incidentral runoff from site. No significant accumulations and bag has capacity. No major trackout or other issues. No corrections at this time.
General Inspection11/27/201511/27/201511/27/2015 PART
DetailsBill VanDegrift
hillside looks good bmp's in place. left message with rp to call me to talk about the driveway and how that is going to be protected after the thaw.
General Inspection11/12/201511/12/201511/12/2015 PASS
DetailsEvan Jenkins
No Activity at time of inspection. BMP's still installed. no discharges leaving the site.
General Inspection10/28/201510/28/201510/28/2015 PASS
DetailsEvan Jenkins
BMP's in good shape, permit still posted.
No ESC issues observed
General Inspection10/8/201510/8/201510/8/2015 PART
DetailsAndy J. Long
WIP. Permit sign posted, trash and materials contained, and perimeter wattles have been installed along back slope properly.

Correction needed:

Need to install a sediment control wattle along bank that was disturbed for water line installation.

Need to sweep up street and area around construction entrance.

Verbal correction called in to RP-GC Brian
Site Preparation9/22/20159/22/20159/22/2015PPASS
DetailsAndy J. Long
Brian Phone #: ###-####

Site walk through with RP-GC conducted. ESC BMPs are installed and include perimeter wattles on slopes, phasing of construction, lined washout containment, and permit sign posted. DI on Hill Rd. has previously installed sediment bag.

Reviewed ESC permit conditions and inspection frequency. Approved for construction.