DOC - Permit Finaled | 11/12/2015 | 11/12/2015 | 11/12/2015 | P | PASS |
Andy J. Long
|
|
|
4-plex building construction complete and parking lot area has been swept and waste material removed.
Carports and open space landscaping in progress is covered under Breckenwood main permit ESC14-01040. This permit finaled.
|
General Inspection | 10/1/2015 | 10/1/2015 | 10/1/2015 | | PART |
Evan Jenkins
|
|
|
WIP: on Exterior and Interior. Small stockpile in Parking Lot needs to be removed, along with debris needs to be placed in the designated trash bin
|