Site Final | 5/19/2015 | 5/20/2015 | 5/20/2015 | A | PASS |
Andy J. Long
|
|
|
Jeremy from HC Company ###-####
Circular cement pad is complete and DI bags have been removed from storm drains in the vicinity. No materials or loose sediment at site.
HC company to remove yellow sign upon meeting with Boise Parks n Rec this afternooon. ESC conditions satisfied.
|
DOC - Permit Finaled | 5/20/2015 | 5/20/2015 | 5/20/2015 | P | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 4/27/2015 | 4/27/2015 | 4/27/2015 | P | PASS |
Andy J. Long
|
|
|
Jeremy Phone #: ###-####
HC Company to begin construction on new outdoor gym at Camel's Back Park. Area of disturbance is lined with construction fencing. Grass will not be disturbed for wattle installation, preservation of exisitng vegetation will be main BMP. DI on 13th and parking has been installed with filter bags as well as parking.
Cement work will be on Friday. Contractor to provide washout container (stationed in parking lot) as part of their contract. Permit posted on tree by project area.
|