Site Final | 4/6/2017 | 4/6/2017 | 4/7/2017 | P | PASS |
Andy J. Long
|
|
|
Home complete, landscaped, and vegetation is establish on upper slope and side drainage channel. ESC permit conditions satisfied. Wattles can remain for stabilization and are bio-photo degradable.
|
General Inspection | 4/6/2017 | 4/6/2017 | 4/6/2017 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 3/22/2017 | 3/22/2017 | 3/22/2017 | | PEND |
Andy J. Long
|
|
|
|
General Inspection | 3/7/2017 | 3/7/2017 | 3/7/2017 | | PEND |
Andy J. Long
|
|
|
|
General Inspection | 2/20/2017 | 2/20/2017 | 2/21/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 2/3/2017 | 2/3/2017 | 2/3/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/19/2017 | 1/19/2017 | 1/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/4/2017 | 1/4/2017 | 1/5/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/20/2016 | 12/20/2016 | 12/21/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/5/2016 | 12/5/2016 | 12/5/2016 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/1/2016 | 12/1/2016 | 12/5/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/16/2016 | 11/16/2016 | 11/16/2016 | | PASS |
Andy J. Long
|
|
|
Home complete but not yet occupied. Revegetation/stabilization still establishing. No issues or offsite sediment discharges observed.
|
General Inspection | 11/1/2016 | 11/1/2016 | 11/1/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/17/2016 | 10/17/2016 | 10/17/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/30/2016 | 9/30/2016 | 9/30/2016 | | PASS |
Andy J. Long
|
|
|
Home complete. NO recent changes. Permit open for continued stabilization of yard and drainage swale. No corrections requested
|
General Inspection | 9/15/2016 | 9/15/2016 | 9/16/2016 | | PEND |
Andy J. Long
|
|
|
Home is complete, landscaped, and for sale. Builder will need to reapply hydroseed to upper slopes, as seed has not been successful. Drainage bed/channel constructed and lined with wattles. No trackout or runoff to the street from irrigation. No corrections at this time.
|
General Inspection | 8/31/2016 | 8/31/2016 | 8/31/2016 | | PEND |
Evan Jenkins
|
|
|
back yard re-veg establishment of 80%
|
General Inspection | 8/16/2016 | 8/16/2016 | 8/16/2016 | | PEND |
Evan Jenkins
|
|
|
Front and side yards have been sodded. Rear hillside yard has been hydroseeded, and is about 50% re-established. Near Completed
|
General Inspection | 8/1/2016 | 8/1/2016 | 8/1/2016 | | PASS |
Andy J. Long
|
|
|
Home is now complete, landscaped and for sale. Upper portion of yard is vegetating well, will consider permit closure next inspection.
Need to control irrigation amount to prevent excessive runoff
|
General Inspection | 7/15/2016 | 7/15/2016 | 7/15/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/30/2016 | 6/30/2016 | 6/30/2016 | | PEND |
Evan Jenkins
|
|
|
re-veg in progress. Sprinkler system currently being installed
|
General Inspection | 6/15/2016 | 6/15/2016 | 6/16/2016 | | PASS |
Andy J. Long
|
|
|
Finishing touches in progress. Back slope and recently installed drainage swale have been hydroseeded and sediment control wattles have been installed. No trackout, no sediiment leaving site. Approved.
|
General Inspection | 5/31/2016 | 5/31/2016 | 5/31/2016 | | PART |
Evan Jenkins
|
|
|
Minor rill occuring in back un-vegetated yard. Ample amounts of BMP's installed. No discharge leaving site
|
Conference | 5/16/2016 | 5/16/2016 | 5/16/2016 | P | DONE |
Evan Jenkins
|
|
|
Met with Contracter, Engineer and Jason Taylor about excessive grading outside on the approved plans and outside of his property line.
Contractor will remove graded soils off adjacent lot and is working with neighbor to correct issues and discuss new retaining wall. Conducted
|
Complaint Inspection | 5/6/2016 | 5/6/2016 | 5/9/2016 | P | FAIL |
Evan Jenkins
|
|
|
dirt is being shifted to the neighbors property
Contractor graded over his property line, onto adjacent lot. PW Jason Taylor will be onsite to discuss grading/drainage issues/changes that were previously approved and fix issues. Will follow up wednesday to check status of esc issues
|
General Inspection | 4/29/2016 | 4/29/2016 | 4/29/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/14/2016 | 4/14/2016 | 4/14/2016 | | PASS |
Evan Jenkins
|
|
|
WIP on SFH. No ESC issues observed at this time
|
General Inspection | 3/30/2016 | 3/30/2016 | 3/30/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 3/9/2016 | 3/15/2016 | 3/16/2016 | P | PASS |
Andy J. Long
|
|
|
No trackout. No discharges offsite to street. Runoff to vegetated area through wattle is not visibly carrying stucco waste, which still needs cleaning.
No corrections issued, home near completion so will be cleaned soon.
|
General Inspection | 3/9/2016 | 3/9/2016 | 3/9/2016 | | PART |
Andy J. Long
|
|
|
WIP on applying stucco. No trackout, sediment control wattles are installed at the downhill perimeter and some vegetative buffer has been preserved.
No containing stucco waste and materials. Need to clean up so that stucco particulate does not flow off the site with stormwater. No trash container.
Need to clean up and contain waste materials around site.
|
General Inspection | 2/22/2016 | 2/22/2016 | 2/23/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 2/5/2016 | 2/5/2016 | 2/5/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/21/2016 | 1/21/2016 | 1/21/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 1/1/2016 | 1/1/2016 | 1/4/2016 | | PEND |
Evan Jenkins
|
|
|
No Activity
|
General Inspection | 12/17/2015 | 12/17/2015 | 12/17/2015 | | PEND |
Evan Jenkins
|
|
|
No activity at time of inspection
|
General Inspection | 12/2/2015 | 12/2/2015 | 12/2/2015 | | PASS |
Evan Jenkins
|
|
|
Near Completion
|
General Inspection | 11/17/2015 | 11/17/2015 | 11/17/2015 | | PASS |
Evan Jenkins
|
|
|
No activity at time of inspection. Permit posted w/ bmp's still installed. No ESC issues at this time
|
General Inspection | 11/2/2015 | 11/2/2015 | 11/2/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no esc issues at this time
|
General Inspection | 10/16/2015 | 10/16/2015 | 10/16/2015 | | PASS |
Evan Jenkins
|
|
|
|