Site Final | 11/25/2015 | 11/25/2015 | 11/25/2015 | P | PASS |
Eric Strole
|
|
|
|
Aging Inspection | 10/29/2015 | 10/29/2015 | 10/29/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: SFH near completion. Disturbed areas need perm re-vegetation/landscaping
|
Site Preparation | 5/21/2015 | 5/21/2015 | 5/21/2015 | P | PASS |
Andy J. Long
|
|
|
###-#### Inspection requested via web by Erby Gonzales
Permit sign posted. WIP per notice with Erbie. Dumptruck moving some dirt around RH #6 so will need to sweep up trackout once the operation is complete. DI bags and washout installed.
|