General Inspection | 12/2/2015 | 12/2/2015 | 12/2/2015 | | PASS |
Andy J. Long
|
|
|
Harris Ranch Smart Start School is complete. Permanent stormwater infrastructure and landscaping is installed. No remaining BMPs. Adjacent staging lot for Terraces covered under main permit.
No loose sediment or building materials on site. Permit conditions satisfied.
|
DOC - Permit Finaled | 12/2/2015 | 12/2/2015 | 12/2/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/16/2015 | 10/16/2015 | 10/16/2015 | | PASS |
Evan Jenkins
|
|
|
|
Random Inspection | 7/23/2015 | 7/23/2015 | 7/23/2015 | P | PASS |
Andy J. Long
|
|
|
Preschool in progress. Permit sign posted, BMPs installed (DI bag, construction entrance, waste containment). Will need to clean up temporary ramp in gutter once curb is cut.
|
Random Inspection | 7/9/2015 | 7/9/2015 | 7/9/2015 | P | PASS |
Andy J. Long
|
|
|
Permit posted, perimeter BMPs installed. No trackout, clean site. No corrections needed.
|
Site Preparation | 5/19/2015 | 5/20/2015 | 5/20/2015 | A | PASS |
Andy J. Long
|
|
|
Jc Phone #: ###-####
Permit posted. Wattles staked down at edge of pavement at the toe of the gentle slope. DIs have inlet protection. Initial grading and plumbing uitilities are in progress this morning. Approved.
|