General Inspection | 11/17/2016 | 11/17/2016 | 11/17/2016 | | PASS |
Andy J. Long
|
|
|
Home occupied and yard is landscaped. Grass on slopes is establishing well. Hillside bond issued. No outstanding ESC violations or corrections needed. ESC permit conditions satisfied.
|
DOC - Permit Finaled | 11/17/2016 | 11/17/2016 | 11/17/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/2/2016 | 11/2/2016 | 11/3/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/18/2016 | 10/18/2016 | 10/19/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/3/2016 | 10/3/2016 | 10/3/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/16/2016 | 9/16/2016 | 9/16/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/1/2016 | 9/1/2016 | 9/1/2016 | | PASS |
Evan Jenkins
|
|
|
work continues slowly no esc issues at this time
|
General Inspection | 8/17/2016 | 8/17/2016 | 8/17/2016 | | PEND |
Evan Jenkins
|
|
|
re-veg. once established, remove temp BMP's
|
General Inspection | 8/2/2016 | 8/2/2016 | 8/3/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/18/2016 | 7/18/2016 | 7/18/2016 | | PASS |
Evan Jenkins
|
|
|
Work in Progress. No issues observed
|
General Inspection | 7/1/2016 | 7/1/2016 | 7/1/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/16/2016 | 6/16/2016 | 6/16/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/1/2016 | 6/1/2016 | 6/1/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 5/17/2016 | 5/17/2016 | 5/17/2016 | | PASS |
Evan Jenkins
|
|
|
WIP: no issues observed at this time
|
General Inspection | 5/2/2016 | 5/2/2016 | 5/2/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/15/2016 | 4/15/2016 | 4/15/2016 | | PASS |
Evan Jenkins
|
|
|
Framing currently taking place. No ESC issues observed at this time
|
General Inspection | 3/31/2016 | 3/31/2016 | 3/31/2016 | | PASS |
Andy J. Long
|
|
|
Foundation and slab is in progress. Street, sidewalk, & gutter clean. No corrections at this time.
|
General Inspection | 3/16/2016 | 3/16/2016 | 3/16/2016 | | PASS |
Evan Jenkins
|
|
|
Curb and sidewalk has been swept well. Large stockpiles have been removed and used for backfill. Site is in good shape at time of inspection
|
General Inspection | 3/1/2016 | 3/1/2016 | 3/1/2016 | | PASS |
Evan Jenkins
|
|
|
work in progress. Debris has been cleaned up and swept
|
BMP Violation | 2/11/2016 | 2/12/2016 | 2/12/2016 | A | PART |
Evan Jenkins
|
|
|
Contractor is currently loading all building materials onto trailers to haul off. Some sweeping still needs to occur on sidewalk and gutter. RP stated excavater is broke down, but will be back onsite next wednesday at latest. He will remove the stockpile and replace damaged waddle. Will reinspect after IECA Texas convention
|
BMP Violation | 2/11/2016 | 2/11/2016 | 2/11/2016 | P | CANC |
Andy J. Long
|
|
|
data entry error. disregard
|
BMP Violation | 2/10/2016 | 2/11/2016 | 2/11/2016 | P | PEND |
Andy J. Long
|
|
|
To Ensure BMP's violation from Posted Correction Notice have been addressed and fixed per BCC 8-17. Came in as a Complaint
Compliance time extended by 24 hr per Evan
|
General Inspection | 2/10/2016 | 2/10/2016 | 2/10/2016 | | FAIL |
Evan Jenkins
|
|
|
Corrections: 1.) Write ESC Permit Number on Yellow Construction Sign. 2.) Remove ALL Building materials off ACHD's Right-of-Way, Curb and Sidewalk. 3.) Sweep Curb, Road and Sidewalk free of all sediment. 4.) Remove Stockpiles from Sidewalk --Failure to comply by 3pm on 2-11-16 Shall Result in a Stock Work Order per BCC 8-17.
|
General Inspection | 1/26/2016 | 1/26/2016 | 1/26/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 1/8/2016 | 1/8/2016 | 1/8/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 12/23/2015 | 12/23/2015 | 12/24/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/4/2015 | 12/7/2015 | 12/7/2015 | A | PASS |
Evan Jenkins
|
|
|
Not activity at time of inspection. No ESC issues observed
|
General Inspection | 12/3/2015 | 12/3/2015 | 12/4/2015 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 11/18/2015 | 11/18/2015 | 11/18/2015 | | PASS |
Evan Jenkins
|
|
|
No activity at time of inspection. No ESC issues observed
|
General Inspection | 11/3/2015 | 11/3/2015 | 11/3/2015 | | PASS |
Andy J. Long
|
|
|
No activity at time of inspection. Perimeter wattles installed along edge of pavement and wire backed silt fence installed at bottom of slope below home foundation excavation. No trackout or sediment runoff observed, permit sign posted clearly. No corrections.
|
General Inspection | 10/6/2015 | 10/15/2015 | 10/15/2015 | P | PASS |
Andy J. Long
|
|
|
Follow up with RP-GC on post excavation phase of BMP installation
Silt fence installed at bottom of slope and trenched in. Wattles protecting stockpile along sidewalk. Permit sign posted. No trackout or sediment leaving site. Approved. No further debris on golf course area below site
|
Complaint Inspection | 10/7/2015 | 10/8/2015 | 10/8/2015 | A | PART |
Andy J. Long
|
|
|
Notified from the Golf Course of ESC issues, no net out and debris falling onto course
Some rock fall and landscaping bricks occured at initial groundbreaking at top of slope. RC-GC has has now closely inspected dig areas to remove the landscaping bricks and larger rocks before any further excavation. Rocks have been picked up and gathered fom stormwater ditch and golf course. Two boulders reached the course, no damage observed. Silt fence would not have stopped the boulders.
At time of inspection, excavator was digging a rock capture berm at bottom of excavated area. Next week after full foundation and yard pad in graded, a silt fence will be installed at toe of disturbed slope.
No other violations observed at site. Will check back next week unless further complaints recieved. It appears to me higher risk section is complete.
|
Site Preparation | 10/5/2015 | 10/6/2015 | 10/6/2015 | A | PASS |
Andy J. Long
|
|
|
Jason Phone #: ###-####
Permit sign posted with contact information and ESC #. RP on site for walk through. Tree cutting in progress.
Steep hillside site, plan is to preserve as much vegetation as possible. Dirt will be backfill at bottom of house and at that time (next week) plan is to install wire backed silt fence. Inspection is scheduled. Crane Creek (currently dry) is a toe of slope. Buffer will be approx. 40-50 ft...
Approved to begin.
|