Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberESC15-00468
StatusFinaled
Name JASON MCKENDRICK
Site Address 1108 N HEARTHSTONE DR
Project NamePendal Vista
Customer Number 
ePlanReviewNo
Description
the construction of a new 3,853 sq. ft., three story (main level 1,932 sq. ft., second level 632 sq. ft. and finished basement 1,289) single family dwelling with 4 bedrooms, 3 and a half bathrooms, approximately 629 sq. ft. of covered patio/porch and a 660 sq. ft. attached garage
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection11/17/201611/17/201611/17/2016 PASS
DetailsAndy J. Long
Home occupied and yard is landscaped. Grass on slopes is establishing well. Hillside bond issued. No outstanding ESC violations or corrections needed. ESC permit conditions satisfied.
DOC - Permit Finaled11/17/201611/17/201611/17/2016PPASS
DetailsAndy J. Long
General Inspection11/2/201611/2/201611/3/2016 CANC
DetailsAndy J. Long
General Inspection10/18/201610/18/201610/19/2016 CANC
DetailsAndy J. Long
General Inspection10/3/201610/3/201610/3/2016 CANC
DetailsAndy J. Long
General Inspection9/16/20169/16/20169/16/2016 CANC
DetailsAndy J. Long
General Inspection9/1/20169/1/20169/1/2016 PASS
DetailsEvan Jenkins
work continues slowly
no esc issues at this time
General Inspection8/17/20168/17/20168/17/2016 PEND
DetailsEvan Jenkins
re-veg. once established, remove temp BMP's
General Inspection8/2/20168/2/20168/3/2016 CANC
DetailsAndy J. Long
General Inspection7/18/20167/18/20167/18/2016 PASS
DetailsEvan Jenkins
Work in Progress. No issues observed
General Inspection7/1/20167/1/20167/1/2016 PASS
DetailsAndy J. Long
General Inspection6/16/20166/16/20166/16/2016 PASS
DetailsEvan Jenkins
General Inspection6/1/20166/1/20166/1/2016 PASS
DetailsEvan Jenkins
General Inspection5/17/20165/17/20165/17/2016 PASS
DetailsEvan Jenkins
WIP: no issues observed at this time
General Inspection5/2/20165/2/20165/2/2016 PASS
DetailsAndy J. Long
General Inspection4/15/20164/15/20164/15/2016 PASS
DetailsEvan Jenkins
Framing currently taking place. No ESC issues observed at this time
General Inspection3/31/20163/31/20163/31/2016 PASS
DetailsAndy J. Long
Foundation and slab is in progress. Street, sidewalk, & gutter clean. No corrections at this time.
General Inspection3/16/20163/16/20163/16/2016 PASS
DetailsEvan Jenkins
Curb and sidewalk has been swept well. Large stockpiles have been removed and used for backfill. Site is in good shape at time of inspection
General Inspection3/1/20163/1/20163/1/2016 PASS
DetailsEvan Jenkins
work in progress. Debris has been cleaned up and swept
BMP Violation2/11/20162/12/20162/12/2016APART
DetailsEvan Jenkins
Contractor is currently loading all building materials onto trailers to haul off. Some sweeping still needs to occur on sidewalk and gutter. RP stated excavater is broke down, but will be back onsite next wednesday at latest. He will remove the stockpile and replace damaged waddle. Will reinspect after IECA Texas convention
BMP Violation2/11/20162/11/20162/11/2016PCANC
DetailsAndy J. Long
data entry error. disregard
BMP Violation2/10/20162/11/20162/11/2016PPEND
DetailsAndy J. Long
To Ensure BMP's violation from Posted Correction Notice have been addressed and fixed per BCC 8-17. Came in as a Complaint

Compliance time extended by 24 hr per Evan
General Inspection2/10/20162/10/20162/10/2016 FAIL
DetailsEvan Jenkins
Corrections:
1.) Write ESC Permit Number on Yellow Construction Sign.
2.) Remove ALL Building materials off ACHD's Right-of-Way, Curb and Sidewalk.
3.) Sweep Curb, Road and Sidewalk free of all sediment.
4.) Remove Stockpiles from Sidewalk
--Failure to comply by 3pm on 2-11-16 Shall Result in a Stock Work Order per BCC 8-17.
General Inspection1/26/20161/26/20161/26/2016 PASS
DetailsEvan Jenkins
General Inspection1/8/20161/8/20161/8/2016 PASS
DetailsEvan Jenkins
General Inspection12/23/201512/23/201512/24/2015 CANC
DetailsAndy J. Long
General Inspection12/4/201512/7/201512/7/2015APASS
DetailsEvan Jenkins
Not activity at time of inspection. No ESC issues observed
General Inspection12/3/201512/3/201512/4/2015 CANC
DetailsAndy J. Long
rescheduled
General Inspection11/18/201511/18/201511/18/2015 PASS
DetailsEvan Jenkins
No activity at time of inspection.
No ESC issues observed
General Inspection11/3/201511/3/201511/3/2015 PASS
DetailsAndy J. Long
No activity at time of inspection. Perimeter wattles installed along edge of pavement and wire backed silt fence installed at bottom of slope below home foundation excavation. No trackout or sediment runoff observed, permit sign posted clearly. No corrections.
General Inspection10/6/201510/15/201510/15/2015PPASS
DetailsAndy J. Long
Follow up with RP-GC on post excavation phase of BMP installation

Silt fence installed at bottom of slope and trenched in. Wattles protecting stockpile along sidewalk. Permit sign posted. No trackout or sediment leaving site. Approved. No further debris on golf course area below site
Complaint Inspection10/7/201510/8/201510/8/2015APART
DetailsAndy J. Long
Notified from the Golf Course of ESC issues, no net out and debris falling onto course

Some rock fall and landscaping bricks occured at initial groundbreaking at top of slope. RC-GC has has now closely inspected dig areas to remove the landscaping bricks and larger rocks before any further excavation. Rocks have been picked up and gathered fom stormwater ditch and golf course. Two boulders reached the course, no damage observed. Silt fence would not have stopped the boulders.

At time of inspection, excavator was digging a rock capture berm at bottom of excavated area. Next week after full foundation and yard pad in graded, a silt fence will be installed at toe of disturbed slope.

No other violations observed at site. Will check back next week unless further complaints recieved. It appears to me higher risk section is complete.
Site Preparation10/5/201510/6/201510/6/2015APASS
DetailsAndy J. Long
Jason Phone #: ###-####

Permit sign posted with contact information and ESC #. RP on site for walk through. Tree cutting in progress.

Steep hillside site, plan is to preserve as much vegetation as possible. Dirt will be backfill at bottom of house and at that time (next week) plan is to install wire backed silt fence. Inspection is scheduled. Crane Creek (currently dry) is a toe of slope. Buffer will be approx. 40-50 ft...

Approved to begin.