Site Final | 8/18/2015 | 8/18/2015 | 8/18/2015 | A | PASS |
Andy J. Long
|
|
|
Corrections complete and bank stabilized with two large boulders. Access drive was swept. All permits finaled.
|
Site Final | 8/3/2015 | 8/3/2015 | 8/3/2015 | P | NR |
Andy J. Long
|
|
|
Corrections needed to final ESC permit:
1. Sweep up access driveway to remove loose sediment/sand 2. Sweep gutter along Cory Court 3. Stabilize bank along north side of irrigation ditch and remove straw wattle that is no longer installed/effective.
Corrections issued to Bill with Harding Homes.
|
Site Preparation | 4/30/2015 | 4/30/2015 | 4/30/2015 | P | PART |
Evan Jenkins
|
|
|
Ty Phone #: ###-####
Permit Posted, waddles line both sides of the irrigation canal. Correction: Pull waddle out of the canal and re-stake to protect canal from any potential sediment entering canal. Ty stated he will do so.
|