Information based on query as of Wednesday, June 19, 2024.
Permit Information
Permit NumberESC15-00499
StatusFinaled
Name CASEY CALICO
Site Address 8687 W OVERLAND RD
Project NameDel Taco
Customer Number 
ePlanReviewNo
Description
New Del Taco drive-through restaurant located at 8687 W. Overland Rd. Boise, Idaho 83702. The proposed site is currently vacant and adjacent to a new Dutch Bros drive-through as well as a proposed Jimmy Johns drive-through restaurant.
The scope of the proposed Del Taco Restaurant includes continuation of the common access drives that currently exist on the Dutch Bros site to the East, a 3,040 gross square foot restaurant, with indoor and outdoor dining, an indoor playground, a drive-through lane and window, as well as 25 parking stalls, landscaping, and a trash enclosure for refuse, recycling, and used cooking grease.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final5/4/20165/4/20165/4/2016PPASS
DetailsAndy J. Long
Temp BMPs and extra stockpile to south of site Del Taco have been removed. Restaurant is open and landscaped. ESC permit conditons satisfied.
General Inspection3/28/20163/28/20163/28/2016 PART
DetailsEvan Jenkins
Remove temp BMP's
Construction complete
Random Inspection2/10/20162/10/20162/10/2016PPASS
DetailsAndy J. Long
RP James to remove wattles and final stockpile. Stated that once weather and ground conditions are better, an asphalt road will connect the Del Taco to the Sonci access road from Ardene.

Lots of joyriders doing cookies on the lot behind the new restaurants and Dutch Bros. Will work to contact owner to post No Trespassing signs.
Site Final2/1/20162/1/20162/2/2016PPEND
DetailsAndy J. Long
Construction complete. Wattles and stockpile remain on adjacent lot. Need to remove and clean area to pre-exisiting conditions.

BLD finaled with Del Taco open. No sediment leaving site, just need to clean materials. Bond issued for landscaping to be completed for zoning approval. Clean up by landscaper will be acceptable.
General Inspection12/23/201512/23/201512/23/2015 PASS
DetailsJim Little
Site is partially landscaped. Rear lot still has stockpile, but there is no trackout occuring, no sediment runoff, or other violations occuring. Materials and waste are contained and site well kept. No corrections.
General Inspection11/3/201511/4/201511/4/2015PPASS
DetailsAndy J. Long
Del Taco near completion. Site is not yet landscaped. Rear lot still has stockpile, but there is no trackout occuring, no sediment runoff, or other violations occuring. Permit sign posted on fence on Overland. Materials and waste are contained and site well kept. No corrections.
General Inspection11/3/201511/3/201511/3/2015 CANC
DetailsAndy J. Long
rescheduled for 11/4
General Inspection9/2/20159/2/20159/2/2015PPASS
DetailsAndy J. Long
WIP on Overland Del Taco. Frontage vegetation along Overland is preserved and access restricted. Construction traffic entering from sout. No fugitive dust, trackout, or discharges. Approved
Complaint Inspection7/15/20157/16/20157/15/2015APART
DetailsAndy J. Long
dust complaint for new del taco work

No fugitive dust at time of inspection, though superintendant stated an operation earlier during the day did creat dust.

I stated for any hauling, grading, and stockpile removal duties dust suppression water applications should be implemented.

Site Preparation6/26/20156/29/20156/29/2015APASS
DetailsAndy J. Long
Del Taco - site prep make up inspection/conference

WIP. Corrections made. Permit sign is now posted on perimeter fence. Met superintendant James ###-#### on site to discuss plans. Concrete work tomorrow will use plastic tub for leakproof washout.

Issued request that stockpile may require dust control or reconfiguration/removal if issues arise and also to notify employees to be mindful of dust when entering or leaving site.
BMP Violation6/26/20156/26/20156/26/2015APART
DetailsAndy J. Long
-No permit sign posted.
- No ESC site preparation scheduled.

Corrections:
- post sign
- schedule site prep inspection for monday. Site is inactive today
- will need concrete washout

Note:
Other BMPs including perimeter wattles are installed and there is no trackout or other violations occuring.

Notified RP of the violations and will meet Monday for site prep