DOC - Permit Finaled | 10/22/2015 | 10/22/2015 | 10/22/2015 | P | PASS |
Andy J. Long
|
|
|
Home complete, front yard landscaped and is now occupied. Adjacent home in progress, so temp BMPs can remain. Trailwind Sub in good condition currenly.
|
Aging Inspection | 10/21/2015 | 10/21/2015 | 10/21/2015 | | PASS |
Andy J. Long
|
|
|
|
BMP Violation | 5/12/2015 | 5/14/2015 | 5/15/2015 | P | PART |
Andy J. Long
|
|
|
Check for new washout and staked in wattles.
Wattles were re-installed properly. Still need to provided new washout. RP stated it will be dug onsite next week and the old &dried out washout removed,
No new violations observed. WIP.
|
Site Preparation | 5/11/2015 | 5/12/2015 | 5/12/2015 | A | PART |
Andy J. Long
|
|
|
Cam Phone #: ###-####
BMPs on site. Straw wattle along Wright is not staked in, gator guard in some areas is staked and backfilled properly. Streets and sidewalks in Trailwind are clean and permit sign is posted. Trash on active projects is contained.
Correction needed before continuing with foundation: 1. New lined concrete washout is needed. 2. Stake in perimeter BMPs 3. Weekly housekeeping by ESC crew should be conducted.
|