Site Final | 5/17/2017 | 5/17/2017 | 5/17/2017 | P | PASS |
Melissa Jannusch
|
|
|
Oaky to final
|
Site Final | 5/17/2017 | 5/17/2017 | 5/17/2017 | P | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 5/17/2017 | 5/17/2017 | 5/17/2017 | | PASS |
Melissa Jannusch
|
|
|
Landscaping complete. Okay to final.
|
General Inspection | 5/2/2017 | 5/2/2017 | 5/2/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/17/2017 | 4/17/2017 | 4/17/2017 | | PEND |
Andy J. Long
|
|
|
Vegetation on temporary access road not yet vegetated to 70%, but grasses and weeds have established. Not ready for ESC final.
|
General Inspection | 3/31/2017 | 3/31/2017 | 3/31/2017 | | PEND |
Andy J. Long
|
|
|
|
General Inspection | 3/16/2017 | 3/16/2017 | 3/16/2017 | | PASS |
Melissa Jannusch
|
|
|
No ESC issues. Revegetation not complete.
|
General Inspection | 3/1/2017 | 3/1/2017 | 3/1/2017 | | CANC |
Andy J. Long
|
|
|
revegetation phase. no inspection
|
General Inspection | 2/14/2017 | 2/14/2017 | 2/15/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 1/30/2017 | 1/30/2017 | 1/30/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/13/2017 | 1/13/2017 | 1/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/29/2016 | 12/29/2016 | 12/29/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/14/2016 | 12/14/2016 | 12/14/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/29/2016 | 11/29/2016 | 11/29/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/14/2016 | 11/14/2016 | 11/14/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/28/2016 | 10/28/2016 | 10/28/2016 | P | FAIL |
Andy J. Long
|
|
|
follow up inspection
No materials removed from site as discussed.
Final warning to Visser Building, re-inspection fees will start to be applied.
Rick w/ Visser will order removal again and update with schedule
|
Complaint Inspection | 10/24/2016 | 10/24/2016 | 10/24/2016 | P | PEND |
Andy J. Long
|
|
|
stockpile of gravel, road mix and debris from construction left near HOA trail. HOA complaint
Followed up with Visser Buidling site manager Rick on debris pile remover. Rick stated pile would begin being hauled off this week. Dump truck with get concrete chunks and wood. Landscape crew to removal gravel. This is supposed to occur this week. Will follow up on Friday. Notified HOA contact of schedule
|
General Inspection | 10/11/2016 | 10/14/2016 | 10/18/2016 | A | PART |
Andy J. Long
|
|
|
No muddy runoff observed from site, but no stockpile removal or response in regards to hydroseeding the disturbed area caused by fence installation
VBC ###-####
|
Complaint Inspection | 10/11/2016 | 10/11/2016 | 10/11/2016 | P | PEND |
Andy J. Long
|
|
|
Complaint for HOA that construction debris left on adjacent proper was not removed...
Roadmix stockpile, concrete chunks and road need to be removed. Hillside bond has been issued.
Informed Visser Building Co. about the stockpile and road created to install fence. VBC to contact me with follow up on stockpile removal. Case pending. Inspeciton/conference rescheduled for Friday.
|
Complaint Inspection | 10/10/2016 | 10/10/2016 | 10/11/2016 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/4/2016 | 10/4/2016 | 10/4/2016 | | PEND |
Andy J. Long
|
|
|
|
General Inspection | 9/19/2016 | 9/19/2016 | 9/21/2016 | | PEND |
Andy J. Long
|
|
|
Home is complete, occupied and BLD finaled. Yard within fence is landcaped and disturbed areas have had a coir fiber mulch applied. Fencing and or other site contractor drove around back of site and even connected to Windsong via another site. Area has not be stabilized or revegetated at time of inspection. Hillside bond has been issued....
|
General Inspection | 9/2/2016 | 9/2/2016 | 9/2/2016 | | PASS |
Andy J. Long
|
|
|
BLD now finaled, but interior finishes and set up is ongoing. Yard has been landscaped and is near stabilization. Next inspection check for inlet protection removal and culdesac cleanup. No spills or violations occuring.
|
General Inspection | 8/18/2016 | 8/18/2016 | 8/18/2016 | | PASS |
Andy J. Long
|
|
|
Final site work in progress. Fence being installed. Large scale landscaping operation. WIP. No trackout or runoff. Will need final culdesac sweep before site final.
|
General Inspection | 8/3/2016 | 8/3/2016 | 8/3/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/19/2016 | 7/19/2016 | 7/19/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/4/2016 | 7/4/2016 | 7/4/2016 | | CANC |
Evan Jenkins
|
|
|
holiday
|
General Inspection | 6/17/2016 | 6/17/2016 | 6/17/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/2/2016 | 6/2/2016 | 6/2/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/18/2016 | 5/18/2016 | 5/18/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/3/2016 | 5/3/2016 | 5/3/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/18/2016 | 4/18/2016 | 4/18/2016 | | PASS |
Andy J. Long
|
|
|
WIP. Hillside home near completion. Will need landscaping/stabilization and culdesac clean up for ESC final.
|
General Inspection | 3/31/2016 | 3/31/2016 | 3/31/2016 | | PART |
Andy J. Long
|
|
|
WIP on large home interior. Need to sweep up gravel from unfinished driveway that is in round about. No other issues observed.
|
General Inspection | 3/16/2016 | 3/16/2016 | 3/16/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/1/2016 | 3/1/2016 | 3/2/2016 | | PASS |
Andy J. Long
|
|
|
No trackout, sediment control BMPs installed below home, no windblown trash or loose material leaving site. No corrections.
|
General Inspection | 2/15/2016 | 2/15/2016 | 2/16/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/29/2016 | 1/29/2016 | 1/29/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 1/14/2016 | 1/14/2016 | 1/14/2016 | | PASS |
Andy J. Long
|
|
|
WIP on interior and frame. No excavation activities. Workers parking on paved culdesac instead of using driveway to reduce trackout. Silt fence BMP is installed at the downhill side of the project. No corrections at this time. Will need to sweep when conditions allow - wet and frozen dirt should be removed as best as practicable
|
General Inspection | 12/30/2015 | 12/30/2015 | 12/30/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/15/2015 | 12/15/2015 | 12/15/2015 | | PART |
Andy J. Long
|
|
|
WIP. New rock put down on dri veway to prevent trackout. Some minor trackout to culdesac should be swept when unfrozen.
Work staying well within clearing limits. Rear silt fence installed.
Correction- Minor accumulations of loose dirt and rock in culdesac and alley should be addressed in regular housecleaning activities as conditions allow. Will monitor throughout week..
|
General Inspection | 11/27/2015 | 11/27/2015 | 11/27/2015 | | CANC |
Andy J. Long
|
|
|
|
Tracking Control | 11/12/2015 | 11/12/2015 | 11/12/2015 | P | PART |
Andy J. Long
|
|
|
Trackout from shared driveway.
Request to sweep up existing trackout and have workers park on culdsac to prevent trackout from their vehicles.
No other violations, work remaining within clearing limits and rear silt fence is installed.
Adjacent project is to have their portion of driveway paved next week.
|
General Inspection | 11/3/2015 | 11/3/2015 | 11/4/2015 | | PASS |
Andy J. Long
|
|
|
WIP on frame. Silt fence installed at bottom of property. Large rock stockpile is not causing issues. Employees parking on pavement, no trackout or discharges observed.
|
Random Inspection | 7/10/2015 | 7/10/2015 | 7/10/2015 | P | PART |
Andy J. Long
|
|
|
GC on site at time of inspection. Hillside home with silty clay soil, all activity has been suspended during the wet weather to avoid erosion and compaction issues.
Permit is posted, downslope perimeter silt fence is properly trenched in. No site prep was scheduled, informed GC M. Visser of the requirement and its purpose.
Need to pick up some trash (cans, bottles) and provide a trash bin.
|