DOC - Permit Finaled | 4/19/2016 | 4/19/2016 | 4/19/2016 | P | PASS |
Andy J. Long
|
|
|
Home complete, landscaped and stabilized. Active projects in Harris Crossing so temp BMPs to remain installed. Subdivision currently in compliance.
|
Aging Inspection | 2/25/2016 | 2/25/2016 | 2/25/2016 | | CANC |
Evan Jenkins
|
|
|
|
Site Preparation | 8/21/2015 | 8/21/2015 | 8/21/2015 | P | PASS |
Andy J. Long
|
|
|
Concrete washout provided. Trash from active projects have been picked up. Permit signs posted.
New phase of 7 new Harris Crossing townhomes are starting.
|