General Inspection | 6/17/2016 | 6/17/2016 | 6/17/2016 | | PASS |
Andy J. Long
|
|
|
All permits finaled. Home now occupied. No corrections for ESC. Project complete.
|
DOC - Permit Finaled | 6/17/2016 | 6/17/2016 | 6/17/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/2/2016 | 6/2/2016 | 6/2/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 5/18/2016 | 5/18/2016 | 5/18/2016 | | PEND |
Evan Jenkins
|
|
|
BLD finaled as of 5-11-16. Re-veg of disturbed areas needs to be established. No discharges leaving site at this time
|
General Inspection | 5/3/2016 | 5/3/2016 | 5/3/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/18/2016 | 4/18/2016 | 4/18/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/31/2016 | 3/31/2016 | 3/31/2016 | | PASS |
Andy J. Long
|
|
|
WIP on interior. No violations. Many contractors on site - project near completion.
|
General Inspection | 3/16/2016 | 3/16/2016 | 3/16/2016 | | PASS |
Evan Jenkins
|
|
|
Construction occuring on exterior and interior. BMP's still inplace. Contractor is currently sweeping out curb with hand broom from a recent delivery of sand
|
General Inspection | 3/1/2016 | 3/1/2016 | 3/1/2016 | | PASS |
Evan Jenkins
|
|
|
Work continues on interior and exterior. Gator Guard still installed along front of project. No ESC issues observed at this time
|
General Inspection | 2/12/2016 | 2/12/2016 | 2/12/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 1/28/2016 | 1/28/2016 | 1/28/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 1/13/2016 | 1/13/2016 | 1/13/2016 | | PASS |
Evan Jenkins
|
|
|
WIP: No ESC issues observed at this time
|
General Inspection | 12/24/2015 | 12/28/2015 | 12/28/2015 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/24/2015 | 12/24/2015 | 12/24/2015 | | CANC |
Andy J. Long
|
|
|
rescheduled for 12/28
|
General Inspection | 12/9/2015 | 12/9/2015 | 12/9/2015 | | PART |
Evan Jenkins
|
|
|
Remove sediment out of the curb and street. Do not park or drive vehicles on lot. Next issues will result in a Stop Work Order. Left VM with RP Dave to disclose issues and to clean up sediment asap
|
Tracking Control | 11/18/2015 | 11/18/2015 | 11/18/2015 | P | PART |
Bill VanDegrift
|
|
|
not too bad left a message with the rp about sweeping minor trackout and protection the spoils pile by the gutter with some bmps
|
General Inspection | 11/4/2015 | 11/4/2015 | 11/4/2015 | | CANC |
Evan Jenkins
|
|
|
Parcel Tag per Jim Wylie. No Inspection
|