DOC - Permit Finaled | 4/19/2016 | 4/19/2016 | 4/19/2016 | P | PASS |
Andy J. Long
|
|
|
This building at Union Square commercial development is complete. Active sites within complete. No ESC violations or outstanding issues. No further inspections required. ESC15-01619 and -01620 are open.
|
General Inspection | 3/18/2016 | 3/18/2016 | 3/18/2016 | | CANC |
Evan Jenkins
|
|
|
|
General Inspection | 2/1/2016 | 2/1/2016 | 2/1/2016 | | PASS |
Evan Jenkins
|
|
|
|
Random Inspection | 12/15/2015 | 12/15/2015 | 12/15/2015 | P | PASS |
Andy J. Long
|
|
|
WIP. All DIs (MS4 & new private) have sediment bag protection. No significant trackout from site entrances. Concrete washout was utilized. Permit signs posted at job trailer. No corrections issued at this time. Will need to make sure temp BMPs are removed from MS4 inlets on Overland, Goldking, and Cable Car.
|
General Inspection | 11/4/2015 | 11/4/2015 | 11/4/2015 | | PASS |
Andy J. Long
|
|
|
WiP on Union Square retail building. Silt fence sediment control installed along Overland, parking lot/access drive is not asphalt so no trackout issues. DI bags on Cable Car have inlet protection. No spills or discharges observed around site, trash and materials are contained. No corrections requested at this time. Approved.
|
Random Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 | A | PASS |
Andy J. Long
|
|
|
WIP. See ESC15-00545 for Union Square Office Bldg #1
|
Site Preparation | 7/30/2015 | 7/30/2015 | 7/30/2015 | P | PASS |
Evan Jenkins
|
|
|
Mike Phone #: ###-####
Permit Posted Water truck is currently on the move Perimeter Controls installed correctly Approved to begin construction
|