General Inspection | 1/27/2016 | 1/27/2016 | 1/27/2016 | | PASS |
Andy J. Long
|
|
|
All exterior work, landscaping/stabilzation, and removal of temporary BMPs is complete. ESC permit finaled; BLD open.
|
DOC - Permit Finaled | 1/27/2016 | 1/27/2016 | 1/27/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/8/2016 | 1/8/2016 | 1/8/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 12/24/2015 | 12/24/2015 | 12/28/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/9/2015 | 12/9/2015 | 12/9/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/20/2015 | 11/20/2015 | 11/20/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/5/2015 | 11/5/2015 | 11/5/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Near completion. Site not yet landscaped but no sediment runoff or trackout is occuring. Trash and materials are contained. No corrections.
|
General Inspection | 6/22/2015 | 6/22/2015 | 6/22/2015 | A | PASS |
Andy J. Long
|
|
|
WIP on excavation for foundation. No sediment runoff and materials are contained. No corrections necessary.
|
Site Preparation | 6/4/2015 | 6/4/2015 | 6/4/2015 | A | PASS |
Evan Jenkins
|
|
|
Data Entry Error
Permit Posted on Electrical Box: He will install waddles along the botttom of the project/hill to ensure to runoff can occure. Approved to begin construction
|
Site Preparation | 6/3/2015 | 6/4/2015 | 6/4/2015 | A | PART |
Evan Jenkins
|
|
|
Please call for meeting - Kelly Phone #: ###-####
Contractor already graded for foundation is prepping for foundation concrete pour. I disclosed the requirements and he apologized. Site is in clean form with no other esc issues Approved to continue
|