Site Final | 8/5/2015 | 8/5/2015 | 8/5/2015 | P | PASS |
Andy J. Long
|
|
|
Rock wall installed and project area stabilized. Rock wall BLD finaled. ESC permit conditions satisfied.
|
Site Preparation | 5/12/2015 | 5/13/2015 | 5/13/2015 | A | PASS |
Andy J. Long
|
|
|
David Phone #: ###-####
Permit sign posted. Homeowner RP is PE building double tier retaining wall. Straw wattle secured around front bank. Approved for construction. Will call for site final - expect to complete by June.
|